My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
3500 - Local Oversight Program
>
PR0545892
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 1:52:40 PM
Creation date
7/22/2020 1:47:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545892
PE
3528
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205-5561
APN
15502064
CURRENT_STATUS
02
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> n 'ail .I <br /> i <br /> Work Plan for Additional Site Assessment + <br /> ARCO Facility No.5469 ! Ii <br /> Stockton,California <br /> ;i Page 3 A <br /> To accomplish this objective, the following activitieslare being proposed: !, <br /> Drill two exploratory soil borings to:approximately 55 feet below ground ' <br /> surface (bgs) and convert the borings to groundwater monitoring wells <br /> (MW-7 and MW-8), it <br /> .ir <br /> • Collect soil samples every five feet from each borehole for field screening <br /> `! and laboratory analyses, �� <br /> • Develop and sample the groundwater monitoring wells, and F <br /> �E J <br /> :f • Survey the elevation and horizontal :coordinates of the top of casing of <br /> each monitoring well. ,'EF <br /> SEI } <br /> 'FI <br /> The scope of work has been subdivided into tasks 1 through 7, which includes <br /> incorporating the newly installed wells into the existing quarterly groundwater.monitoring ' 1 <br /> program. All geologic work will be conducted under the direct supervision of a State of <br /> California Registered Geologist and will be conducted in accordance with standards <br /> established by the Tri-Regional Board Guidelines for Hydrocarbon Site Assessment and . <br /> Remediation (RWQCB 1991). <br /> Task 1: Prefield Activities <br /> Following approval of the work plan by San Joaquin County PHS/EHD, the following <br /> activities will be implemented: All <br /> • " Prepare a site-specific Health and Safety Plan, <br /> • Secure permits from San Joaquin ;County PHS/EHD to install two <br /> groundwater monitoring wells, <br /> • Mark the proposed well locations and notify Underground Service Alert, <br /> ARCO, and San Joaquin County PHS/EHD of the scheduled field activities. <br /> Task 2: Soil Borings and Monitoring Well Installation <br /> To characterize the lateral extent of petroleum hydrocarbon impacts to groundwater, two <br /> onsite groundwater monitoring wells (MW-7 and MW-8) will be installed to a depth of <br /> approximately 55 feet bgs. The monitoring wells will"be constructed using 4-inch diameter <br /> PVC casing., The proposed locations of the monitoring wells are shown on Figure 2. The <br /> actual location of the monitoring wells will be based on accessibility and the location:of <br /> underground utilities. i, f <br /> P CAARCO154691Work P!an15469wrkpin.doc Delta <br /> ,� 311912001 { <br />
The URL can be used to link to this page
Your browser does not support the video tag.