Laserfiche WebLink
Cisco Air Systems WORK ORDER INSPECTION SHEET (®R <br /> Camprrued Afr So7utbnx 5lnrel973 <br /> 24 HR.EMERGENCY SERVICE <br /> Inprncutwind00i-ibu 012- oft heYear g�.y �,r f y� <br /> 1001•2008.2012.2pi6 ld i �8 <br /> Industrial Technologies <br /> Date of Ins ection 2017-07-12 Make IR <br /> Customer Name Que t industries" 0 RKG <br /> Customer Address 2518 Boeing Wa Madel# N6oN-CC Sruoo Algin <br /> Customer Contact Benn Garcia Serial# NV2909UO6243 I �Sertirtcer, II �_ <br /> W.p.# CPC328631 ;3tatt U <br /> OK'Fixed I Chan ed I Cleaned/ ebuilt DuringVisit, t 0 <br /> Fixed/Chan ed/Cleaned I Rebuilt During Visit <br /> StrII,R tures Re""Ir#C iti 1'"anit5 <br /> 777 <br /> 1 'FIII Out Oran a Card-Re lace if Necessa SII ile i`"titres_ te""air l hat1 Ip GteEW6� <br /> 2 Run Hrs x3108 Load Hrs 40 1st Stage Dischar a Tem lure Full Load <br /> 3 _FuIF LLoad Pk .Disch 41 1/C Press. Loaded Unloaded <br /> 9 rgeTemperature 110 42 Z'. Oil Pressure OiI Te;m <br /> 4 Full Load Airend Disc arge Temperature 19a 43 f;2nd Stage Inlet Temperature <br /> 5 Full Load Coolant In ction Tem erature 189 44 <2nd Stage Discharge Temperature <br /> 6 Tar at Press. 110 Load/Unload <br /> 7 Auto Sto 115 immed,Stn 125 46 ` t Unloaded Inlet Vacuum <br /> 6 = Sump Pressure Inspect and Clean Gearcase Breatpher f <br /> 9 4 Inlet Filter Condition <br /> 10 r ;PDM Filter Condition • • • '2' 2 <br /> 11 47 Voltage G A ! <br /> :<Check Coolant Full Load <br /> 12 s `> Inspect for Coolant Leaks F ' <br /> 1348 Voita9e Q s fA B <br /> Coolant Filter No Load <br /> 14 Full Load Separator Pressure Drop 49 0 D F <br /> 15 InspectandCleanSc v.OrifIScreen <br /> 16 ! Room Ambient Temperature 105 50 <br /> 17 51 ro art <br /> Thermostatic Control Valve Tem erature 52 fi°'; <br /> 18 Ports A R C D 53 an otorTtYU <br /> 19 Inspect for Air Leaks 54 0 o 6NU. <br /> 20 'Inspect/Clean All Air C oled Coolers Cleaned 4H s0 R ` X40 P 1.25 <br /> 21 Inspect/Clean Conden ate,Drainsrattre HP V 400 A.,'; 120 <br /> 22 ' Inspect Hall Effect Se ors b5 a =F':inspect Contactors <br /> 23 inspect&Clean Maln nd Blower Motors v6' 'Ck Electrical Conn. <br /> 57 Control Voltage <br /> 24 Grease Main and Fan Motor , <br /> 26 77 WC 0/C T P 58 3x DC Bus Voltage(Full Load) <br /> WC A/C T P 59 ? ; Package Kw <br /> 27 Safety Valve Installed nd0 erationai 60 Motor Speed(Max) <br /> 28 Dryer Condensor and rainDew Point 61 : ;'Motor V(Max Speed&Target f?) <br /> 29 Inspect Inlet Valve 62 i. MotorA.(Max Snead&Tar et P. <br /> 3o77-7— Inspect Discharge C.V.and/or MPV 63 X Rotor Clearance <br /> 31 �;Inspect Blowdown Vaiv <br /> 32 =Coupling(Or Belts)Coi clition x , <br /> 33 inspecfAli doses NlR AJ�Ift IRI A 1 Stage) 2 Sta e (NOT <br /> 34 , ��-� -' Y _ mr1 mr2 1 m1 I m2 h m1 h m2 DE <br /> �'Inspect OW5 64 Loaded dBm <br /> 35 Inspect Coalescing&P rticulate Filters <br /> o , o 65 Loaded dBe <br /> • ° • • • 66 Loaded dBi <br /> 37` Courant Type ultra coolant =a>;; IERRt�Bc Olt F3 mbr b 1 m1 Tp m2 h m1 h m2 ODE <br /> 37 Hours on Coolant 1303 67 Loaded dBm <br /> 38 '' _• Coolant Sample Taken Yes 68 Loaded dBe <br /> 39 Acid Test Performed Yes 69 Loaded dBi <br /> 0 <br /> Removed and replaced thermal Ive.'Ran and tested good Took temperature readings. Discussed repair with Denny. <br /> Matt Gaska <br />