Laserfiche WebLink
m <br /> BUILDING <br /> f•+MW 1MY" <br /> �� <br /> 1,900 <br /> � 180 <br /> <0.50 <br /> MVtW 990 <br /> AC PAVING 123,00010 <br /> $ �G 85 32`�� <br /> �50 m"�4.2 <br /> < Qb MW-7 <br /> <50l <br /> <0.50 <br /> <05DJ <br /> o mw-1 <br /> <50 3,400 <br /> 57 MWe� 4500 <br /> 15,000 <br /> MWS ARCO FACILITY <br /> Q) NO.5486 <br /> 120 <br /> EXISTING `` <12 <br /> UST COMPLEx 490 <br /> <50 AC PAVING <br /> <0.50 <br /> 1.8 1 MW zQ5 <br /> MW-3Z <50 l <br /> <5 0J <br /> <0.50 <br /> PUMP <br /> ISLANDS <br /> OAC PAVING <br /> O <br /> ORNEWAY <br /> LEGEND- <br /> la MVk1 MONITORING WELL LOCATION <br /> <5p GASOUNERANGEORGANICSCONCENTRATIONINMICROGRAMSPERUTERpg& <br /> L<0.50 BENZENE CONCENTRATION IN pa/L <br /> <0.50 MTBL <br /> E CONCENTRATION IN PUL <br /> SAMPLES COLLECTED ON 8!08104 <br /> GRO ANALYZED USING EPA METHOD 8015 <br /> BENZENE AND MTBE ANALYZED USING EPA METHOD 82MB <br /> 'WELL SCREENED IN A DEEPER PORTION OF THE WATER BEARING ZONE <br /> aa 0 40 FT <br /> R <br /> 31 SCALE <br /> ' ARCO FACILITY NO.5469 FIGURE <br /> 130 WILSON WAY <br /> STOCKTON,CALIFORNIA 4, <br /> F <br /> GROUNDWATER ANALYTICAL.SUMMARY PROJECT NO. <br /> 2nd QUARTER 2404 U 5469-01,4 <br /> _ <br />