Laserfiche WebLink
ARCO FACILITY NO. 5469 <br /> 130 Wilson Way} <br /> IGIN Stockton, CA <br /> • Lzone injection System Using C-Sparge <br /> Date: Ci� y"j� Technician: a�L <br /> Onsite Time-. �`✓ d Project Engineer: �� s <br /> OttsiteTsme:_)94a _ Weather Conditions: e r/ <br /> Ambient Temperature: <br /> C-Spargerm Panel: <br /> No. of Wel{ Connected 5 <br /> Panels: <br /> System Status: WOperationai ❑ Non-operational <br /> Hour Meter Reading: �f /LJ f_-- <br /> Injection Pressure: 7767 <br /> Field Measurrnents(Monthly) <br /> Well ID Time DTW pH DO <br /> MW-1 <br /> MW-4 <br /> MW-5 <br /> Mw-6 <br /> MW-7 <br /> I <br /> MW-8 <br /> MW-9 <br /> MW-10 <br /> Field Measurments(Quarterly, In addition to Monthly) <br /> MW-2 <br /> MW-3 <br /> Lab Parameters Sampling Frequency Sample Locations Analytical Method <br /> Chemcal oxygen demand Quarterly MW-1,MW-4 through MW-10 EPA 410.4 <br /> Total Iron Quarterly MW-1, MW-4 through MW-11 EPA 60108 <br /> Heterotrophic Plate Counts Quarter4y MW-1,MW-4 through MW-12 SM 9215B <br /> Total Organic Carbon Annually MW-1,MW-4 through MW-13 EPA 415.1 <br /> Total Dissolved Sdids Annually MW-1,MW-4 through MW-14 I=PA 160.1 <br /> . Nitrates and sulfates Annually MW-1,MW-4 through MW-15 EPA 300.0 <br /> Phosphates Annually MW-1,MW-4 through MW-16 EPA 365.3 <br /> Page i of 1 <br />