Laserfiche WebLink
r <br /> CC <br /> GROUND ZERO ANALYSIS, INC. v` - <br /> 1714 Main Street <br /> Escalon,California 95320 <br /> Telephone:(209)838-9888 O C T ZOO$ <br /> Facsimile:(209)838-9883 <br /> ENVIRONMENT HEALTH <br /> October 1,2008 PERMIT/SERVICES <br /> Mr. Scott Cooper <br /> San Joaquin County Department of Public Works, <br /> Permits Department <br /> 1810 East Hazelton Avenue <br /> Stockton, CA 95205 <br /> Subject: Encroachment Permit Application for Soil Borings <br /> Former Harry's Auto Mart, <br /> 2662 N.Wilson Way, Stockton, CA(Site Code: 1306) <br /> Dear Mr. Cooper: <br /> Please find enclosed applications for an Encroachment Permit to conduct an additional subsurface <br /> investigation at the subject site in the City of Stockton right of way. The work requiring an <br /> Encroachment Permit includes advancing one (1) soil boring on the south side of Robindale <br /> Avenue approximately 110 feet west of North Wilson Way and advancing one (1) soil boring on <br /> the east side of Sanguinetti Lane approximately 15 feet south of Robindale Avenue. Included in <br /> Attachment A are copies of the Workplan proposing the additional subsurface investigation and a <br /> copy of correspondence from the San Joaquin County Environmental Health Department (EHD) <br /> requesting the additional subsurface investigation at the subject site. The work is being conducted <br /> as part of a fuel leak investigation under EHD oversight. <br /> Gregg Drilling, a C-57 licensed drilling contractor, will advance the two soil borings. The soil <br /> borings will be advanced to an approximate depth of 60 feet below the ground surface(bgs) for the <br /> purpose of collecting groundwater samples. Upon completion the borings will be grouted to the <br /> surface with neat cement grout and finished with an asphalt patch to match the surrounding street. <br /> Each boring will take approximately two hours to complete. The site work covered under the <br /> requested Encroachment Permit is expected to take one day to complete. The approximate <br /> locations of the proposed soil borings are shown on Figure 2. <br /> Traffic control measures will be designed in order to provide safe and expeditious movement of <br /> traffic while allowing the intended work to progress safely and efficiently. At minimum, all site <br /> personnel will be equipped with Level D PPE including orange safety vests or equivalent. The <br /> traffic control system designed for the work on the southern shoulder of Robindale Avenue and <br /> GAGROUNDZEQIARRYS AUPOTennits&Applications\encipennitcmdoc <br />