My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
2662
>
3500 - Local Oversight Program
>
PR0545898
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 3:38:19 PM
Creation date
7/22/2020 3:32:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545898
PE
3528
FACILITY_ID
FA0005555
FACILITY_NAME
MALIK ALL TIRES WHEEL
STREET_NUMBER
2662
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11706033
CURRENT_STATUS
02
SITE_LOCATION
2662 N WILSON WAY
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUALITY ASSURANCE AND QUALITY CONTROL PLAN <br /> The Remedial Investigation (RI) Quality Assurance/Quality Control (QA/QC) program is intended <br /> to facilitate the acquisition of accurate and reliable data. Environmental data gathered during the RI <br /> will be collected and analyzed following procedures prescribed in the Quality Control Program. A <br /> Quality Assurance Program has been established to assure that the Quality Control Program is <br /> effective. Both programs are necessary to provide accurate data and documentation for <br /> investigations and laboratory analyses. The following field and laboratory procedures will be <br /> implemented to ensure that QA/QC objectives are met. <br /> 1.0 RECORDING OF FIELD DATA <br /> All information pertinent to the field investigation will be kept in a field log book. Information to <br /> be documented includes at least the following: <br /> - Sample numbers <br /> - Locations of sample collection <br /> - Soil boring or well numbers, as applicable <br /> - Depths at which samples were obtained <br /> - Names of collectors <br /> - Dates and times of collection <br /> - Purpose of sample <br /> - Sample distribution (e.g. laboratory, archive, etc.) <br /> - Field observations <br /> - Field measurements (e.g. PID readings, pH, conductivity, water levels.) <br /> - Other data records (e.g. development log, soil sampling report, well log, etc.) <br /> 2.0 SAMPLE CONTAL1 ERS <br /> Groundwater samples will be placed in containers supplied by the analytical laboratory. Table 1 <br /> summarizes the required sample containers. Soil samples will be collected in either 8-ounce <br /> widemouth clear glass jars provided by the laboratory or in clean brass or stainless steel tubes <br /> (Table 1). Screw on caps will be fitted with Teflon liners. Tubes will tightly capped and sealed. <br /> G:\Data\GROUNDZE\QAQC\QAQC.doc <br /> I <br /> I <br /> j <br />
The URL can be used to link to this page
Your browser does not support the video tag.