My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
2662
>
3500 - Local Oversight Program
>
PR0545898
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 3:38:19 PM
Creation date
7/22/2020 3:32:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545898
PE
3528
FACILITY_ID
FA0005555
FACILITY_NAME
MALIK ALL TIRES WHEEL
STREET_NUMBER
2662
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11706033
CURRENT_STATUS
02
SITE_LOCATION
2662 N WILSON WAY
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Jeffery Wong <br /> Page 3 <br /> After stabilization of pH, temperature, and electrical conductivity, and water level recovery of at least <br /> 80%, samples will be collected into appropriately labeled containers, and placed in an ice chest <br /> refrigerated to a temperature of 4°C for shipment to a State-certified laboratory under chain of custody <br /> protocol. Sample analysis will consist of TPHg, BTEX, gasoline oxygenate additives, DCA and EDB <br /> using the above EPA methods. <br /> Protocols and Safety <br /> All field activities performed at the site will be conducted in accordance with the Quality <br /> Assurance/Quality Control Plan and Site Specific Health and Safety Plan included in Attachments B and <br /> C, respectively. <br /> Drill cuttings will be placed on and covered with plastic sheeting. Water generated from well purging <br /> and equipment decontamination will be contained in labeled DOT approved drums. The soil cuttings <br /> and drums will be stored on site pending laboratory results and proper disposal. <br /> Permitting and Schedule <br /> Well construction permits, encroachment permits and associated fees will be submitted to the appropriate <br /> agencies subsequent to approval of this workplan. Following receipt of the permits, fieldwork will be <br /> scheduled. The Workplan to conduct an ozone injectionpilot test will be submitted as a Workplan <br /> Addendum. <br /> In response to your request for additional information regarding "Well E" (EHD corresp, April 3, <br /> 2002), please note that only four water supply wells (A through D) were identified within a 2000 foot <br /> radius of the site. The location plotted as "E" was identified as a church. Tabulated data and source <br /> information are included in Table 3. Locations are identified on Figure 5. <br /> Please contact Ground Zero at your earliest convenience if you have any questions or comments <br /> regarding this report. <br /> Respectfully, <br /> Ground Zero Analysis <br /> T�2 Sean Garvey, GREGORY P. � <br /> Staff Geologist /J gTqF <br /> No. 5023 <br /> Gregory P. Stahl, RG 5023 OF 0A11F���\� <br /> CA Registered Hydrogeologlst 264 <br /> cc: Mr. and Mrs. John Ferraiolo <br /> Mr. Marty Hartzell, CA Regional Water Quality Control Board <br /> Ms. Marla Nahorn, Environmental Closures <br /> \\GZA FS\SYSO1\Data\GROUNDZE\HARRYS\Reports\Workplans\WKPLAN 3MWS_RFS.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.