Laserfiche WebLink
San Joaquin County EHD <br /> September 5, 2008 <br /> Page 9 of 10 <br /> Zero proposes advancing two borings and collecting groundwater samples at the locations shown <br /> on Figure 2. V&W will advance the borings using a drilling rig equipped with eight-inch diameter <br /> hollow stem augers. The borings will be drilled to the capillary fringe and a hydropunch tool will <br /> be advanced inside the augers into the water table and groundwater samples collected. <br /> The groundwater samples will be collected through the hydropunch tool,placed into the appropriate <br /> containers, checked for headspace, uniquely labeled, temporarily stored on ice in an ice chest <br /> cooled to approximately 4°C, and will be delivered under chain of custody protocol to Argon <br /> Laboratories. The groundwater samples will be analyzed for TPHg using EPA method 8015M, <br /> BTEX by EPA method 8021B, and gasoline oxygenate additives, including 1,2-DCA and EDB <br /> using EPA method 8260B. <br /> Obtaining encroachment permits for drilling in county right of way has been time consuming in the <br /> past. Ground Zero proposes that the pilot test activities continue without delay while the <br /> encroachment permits for this phase of work are processed. <br /> Protocols and Safety <br /> All field activities performed at the site will be conducted in accordance with the Quality <br /> Assurance/Quality Control Plan (Attachment B) and Health and Safety Plan (Attachment C). <br /> Reporting <br /> Following the receipt of analytical data, Ground Zero will prepare a technical report describing <br /> field activities, results, conclusions, and recommendations for submittal to EHD. <br /> References <br /> Blaes Environmental. 2007. U-Haul Store #709-50 Remedial Action Report. April 10, 2007 <br /> Ground Zero. 2008. Site Conceptual Model. February 29, 2008 <br /> Ground Zero. 2008. Feasibility Study—Soil and Groundwater Remediation Report. July 2, 2008. <br /> Johnson, P.C., et. al. 2002 Air Sparging Design Paradigm. Battele Memorial Institute. <br /> GAGROUNDZEMARRYS AUTO\Reports\Workplans\wp sve pilot test.doc <br />