Laserfiche WebLink
UST SYSTEM RETROFIT OR REPAIR <br /> ( Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br /> 1 . Site map enclosed ? YES = NOM <br /> 2 . Submit copies of ICC Service Technician and/or Installer' s certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced . Ensure a copy of the "Site Health and Safety <br /> Plan " is available on the jobsite as required by Title 8 . <br /> 3 . Detailed description of work to be completed . List components to be repaired or replaced and attach a di gram drawn <br /> to scale showing location of repairs and/or replacements . If repairing a component, describe how this will be done . ( If <br /> addingpiping , UDC 's , or other UST equipment , or performing tank top upgrade , use the UST Insulation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> replace direct bury fill buckets on 87 and Diesel tanks <br /> f f <br /> excavation required <br /> 4 . List of equipment to be used (Alta manufacturer's specification sheets showing third-party approval ) : <br /> OPW 2100-C fill buckets <br /> > <br /> 2 <br />