Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM ( Page 6 of 6) <br /> MIN LINE LEAK DETECTOR TESTING <br /> ❑ Check this box if line leak detectors (LLD) are NOT installed , (Do not complete this section.) Y N NA <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? ® ❑ ❑ <br /> (Check all that apply.) Simulated leak rate verified : ® 3 GPH ❑ 0 . 1 GPH ❑ 0. 2 GPH <br /> Was the testing apparatus properly calibrated? ® ❑ ❑ <br /> For emergency generator tank systems , does the LLD create an audible and visual alarm when a leak is detected? ❑ ❑ Q <br /> For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected? Qr <br /> El <br /> For electronic LLDs , does the turbine automatically shut off when a leak is detected ? ❑ ZFor electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected ? ElV1For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? E71 <br /> For electronic LLDs , have all accessible wiring connections been visually inspected for kinks and breaks ? ❑ ❑ <br /> Were all items on the equipment manufacturers maintenance checklist completed? ® El El <br /> Were all LLDs confirmed operational within regulatory requirements ? ✓❑ ❑ ❑ <br /> For any answer of "N" above, describe in Section X111 how and when these issues were or will be corrected. <br /> XIII . COMMENTS <br /> XIV, VACUUM / PRESSURE / HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> © Check this box if VPH monitoring is NOT used , (Do not complete this section.) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type (Mark all that apply,) ❑ Vacuum ❑ Pressure ❑ Hydrostatic <br /> SSensor Functionality Interstitial Communication <br /> ensor ID Component(S) Monitored By This Sensor <br /> Test Test <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> i <br /> ❑ Pass [:1 Fail ❑ Pass ❑ Fail <br /> E] Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass Fail <br /> How was interstitial communication verified ? ❑ Simulated Leak at Far Ends of the Interstitial Space ❑ Visual Inspection <br /> ❑ Other (Describe the method in section XV below.) ❑ Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces ? ❑ Yes ❑ No (Describe the reason in section XV below.) <br /> For any answer of "Fail' above, describe in Section XV how and when these issues were or will be corrected. _ <br /> XV, COMMENTS <br /> GPH = Gallons Per Hour, Y = Yes, N = No, NA = Not Applicable, VPH = VacuunVPressureMydrostatic, ID = Identification <br /> I <br />