Laserfiche WebLink
Purge Log Form <br /> Project Name <br /> J& QL-t Project Number 3)L Site Location <br /> wo / Q Date 03/15—/03- � Field Tech Pr <br /> Total Depth / 009 -)- Depth to water 5-)L- . 1 Water Column Length <br /> CasinDiameter - Casg Factor <br /> Volume Calculation 1 <br /> Total Purge Volume_ 33 Y Casing volumes Produced 9--LPump Type 3-&v <br /> PH Meter UFS Calibratedor N Cond Meter 00 k*� <br /> V Calibrated&or N <br /> Temp Meter makTurbidity Meter /-'4 Calibrated Y or N <br /> [Casco-Factor 2 17 3"=33 4"=66 5"=1 02 6"=I 5 8"=2 6 (In GaIIons per linear foot)] <br /> Time Prod Rate Gallons(total) DTW Ph Ec Tem (°C) Turbidity Comments <br /> -)s 03'K 1'_o AA <br /> �. <br /> 73.8 6'q 3'0 J1 <br /> torage or Disposal Method rr Total Drums Onsite <br /> ercent Recharge Prior to Sampling ' Sample Collection Method <br /> ample Labeled A -t/ / .0 Sample Time I y d Laboratory <br /> nalysis 'Os', FO s bj Q1 <br /> No of Containers � <br /> uplicate Trip Blank Rinsate BIank <br /> amments <br /> s <br />