Laserfiche WebLink
09 J-2 <br /> WORK REQUEST FORM <br /> • Date of Request q 04/30/03 Completion Date 05/05-06/03 <br /> Project Harry's Auto Project #/ Task # 327 <br /> Site Address 2662 N Wilson Way (x-st = Sanguinetti), Stockton <br /> Project Mgr Stahl Personnel A Scoma <br /> Client Contact John Ferriaolo Phone # 800/458-5599 <br /> Reg Contact Mike Inf irna Phone # 209/468-3454 <br /> Tenant Adolph Phone # 209/464-2008 <br /> 209/464-3690 <br /> Approval �' Completion Date <br /> QUARTERLY MONITORING AND SAMPLING and SPLIT SAMPLE <br /> COLLECTION <br /> Notify Milce Infurna, John Ferriaolo and Adolph ASAP. Blaes Environmental has already <br /> been contacted to coordinate monitoring (new contact is Steve Woodhull (602) 728-0707). <br /> Blaes will be collecting splits of our samples and we will be collecting splits of theirs. Don't <br /> I <br /> orget to bring the key to the site. <br /> Meet up with Blaes technicians on Monday and ascertain their estimated schedule for monitoring <br /> and sampling Tech's are Mike Gerber and Greg Coffin, mobile phone (602) 549-0923) Call in <br /> to me at this point. Measure DTW and DTB in all wells in order Order is U-Haul MW7, <br /> MW3, MW2, MW4 and MW1 UHMW7 and MW3 are fairly clean, MW2 and MW4 are hot <br /> Well MW I is very hot <br /> Purge and sample all wells in order Onsite wells are 60-65 feet deep, 2" diameter, water should <br /> be about 52-55 feet or deeper, wells may even be dry See attached table UHMW7 is 85 feet <br /> deep, 4" diameter Use bailers for MW 1 - MW4 and ES-60 or Grundfos pump for MW7 <br /> Sample for TPHg/BTEX (8015/8020) and oxygenates + 1,2 DCA and EDB (8260) Notify <br /> Blaes techs when wells are ready to be sampled so they can collect their own splits. Samples <br /> to Argon Labs Specify on COC that data needs to be delivered in EDF and hard copy. <br /> You will also need to collect split samples from selected U-Haul wells. These are_going to be <br /> MW#3B, MW3C, MWftA, MW6B, MW6C, 1V6W9A, MW9B, MWIO'B and <br /> Nf�VOC. You will need to make sure you have enough disposable bailers. Send splits to <br /> gon for TPHg/BTEX/Oxy, 1,2-DCA and EDB. Blaes techs are supposed to purge these <br /> wells first (after MW12 in street). Probably will be ready for sampling on Tuesday. <br />