My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
15
>
2300 - Underground Storage Tank Program
>
PR0231404
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2020 9:20:51 AM
Creation date
7/23/2020 10:05:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231404
PE
2361
FACILITY_ID
FA0002915
FACILITY_NAME
TRACY MARKET INC
STREET_NUMBER
15
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21435004
CURRENT_STATUS
01
SITE_LOCATION
15 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PREVENTIVE MAINTENANCE Good Valve <br /> Annually,inspect the flapper in the 71 SO to see that it is <br /> open by looking down the drop tube opening (see in- "Deflection Shield <br /> spection procedure below). Test the 71 SO drop tube / �ith Poppet <br /> seals with CARB procedure TP-201.1 D. If the drop tube .1 UJA <br /> protected <br /> seal passes testing,no further maintenance is required. <br /> If the drop tube fails testing,replace the drop tube seal <br /> with OPW P/N:H 11931 M for 4"Tubes. Re-test the 71 SO <br /> drop tube with CARB procedure TP-201.1 D. The lower "'i go <br /> tube o-ring seal OPW P/N:H14840M can also be re- C� s <br /> placed. If this does not correct the leak the 71 SO needs " �'— <br /> to be replaced. <br /> Bad Valve <br /> FOR TESTABLE MODELS ONLY: The socket adaptor <br /> can be removed and poppet and float movement and Deflection Shield <br /> r <br /> function inspected without removing the valve. See <br /> � with Poppet exposed <br /> Page 17 for full testing details. If replacement parts are <br /> needed for testable models the following items are <br /> available: OPW P/N 206741 Testable Inlet Tube S/A, h <br /> 206740 Socket Adaptor and Cable Assembly,and 61 SOK <br /> 0001 Float Kit. <br /> rrz} <br /> CAUTION: Do not insert any foreign object into drop Figure 27 <br /> tube if flapper is in the closed position. For exam- Note: Figure 27 shows poppet location with float arm <br /> ple,a tank level measuring stick. This will damage not activated. <br /> the valve and void the Warranty. ALWAYS check <br /> flapper location before"sticking"the tank. If flap- INSP 4. Inspect the float by lifting upward. The float <br /> per is in the closed position,the tank is either over- should move freely without any binding. See Figure <br /> filled and you need to wait until the liquid level goes 28. <br /> down or the 71 SO is damaged and needs to be re- <br /> placed. <br /> Inspection Procedure to Ensure Proper Operation s <br /> tt.aea:�. s <br /> Note: For testable models valve does not need to be <br /> removed from tank. Seepage 17 for testable instruc- <br /> tions. <br /> INSP 1. Remove the overfill valve from the tank as <br /> de- <br /> scribed in step 26. ? 11 <br /> INSP 2. Visually inspect the valve for damage. Make <br /> sure no debris or foreign objects are in or on the valve. <br /> INSP 3. With the float in the normal (down) position, <br /> visually inspect the valve to ensure the poppet is not Figure 28 <br /> exposed outside the deflection shield. See Figure 27. INSP 5. View down the tube to ensure the poppet is <br /> moving into the flow path when lifting the float. See <br /> Figure 29. <br /> 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.