My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2300 - Underground Storage Tank Program
>
PR0231604
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 3:22:51 PM
Creation date
7/23/2020 10:44:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231604
PE
2361
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer D Industry Standard D Professional Engineer <br /> D Other(Spec) <br /> Test Method Used: X Pressure D Vacuum D Hydrostatic <br /> D Other(Spec) <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br /> Piping Run#1-87 Piping Run#2-91 Piping Run# Piping Run# <br /> Piping Material: Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith <br /> Piping Diameter: 3" 3" <br /> Length of Piping Run: Approx. 160' Approx. 140' <br /> Product Stored: Regular 87 Super 91 <br /> Method and location of Test boot at Test boot at <br /> piping-run isolation: Piping Sump#1 Pi in Sum #2 <br /> Wait time between applying 5 Minutes 5 Minutes <br /> pressure and startin test: <br /> Test Start Time: 12:20 12:25 <br /> Initial Reading(Ri): 5 Psi 5 Psi <br /> Test End Time: 1:20 1:25 <br /> Final Reading(RF): 5 Psi 5 Psi <br /> .Test Duration: 1 Hour 1 Hour <br /> Change in Reading(RF-Ri): 0 Psi 0 Psi <br /> Pass/Fail Threshold or No detectable loss No detectable loss <br /> Criteria: <br /> Test Result: Pass Pass <br /> Comments— (include information on repairs made prior to testing, and recommended allow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.