Laserfiche WebLink
WCEIVED <br /> SWRCB,January 2002 MAY 29 2018 page of_ <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested X *See Comments <br /> Test Method Developed By: ❑Spill Bucket Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure 0 Vacuum 0 Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# Spill Boz# Spill Box# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(R,): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-Ri): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up or failed tests) <br /> Spill/Overfill Containment Boxes tested annually with,Monitoring System Certification. <br />