Laserfiche WebLink
bp <br /> y <br /> VEEDER ROOT CARBON CANISTER VAeOR eOLISHER <br /> 'Zmm <br /> COMeLIANCE AND INSTALLATION NOTES <br /> THESE NOTES ARE APPLICABLE -1-0 NEW AND RETROFIT INSTALLATIONS <br /> L()CAA_UL)N OF VAPOR Pf�C?CE:SSiNU E,Q.UIE MENT G/�Fi,f ( ?I TT AL7C)ITfC)NA_I�.INS>.;(ALLATtQN.._NOTES: <br /> ADDITIONALr_INSTALLATION _NOTES_ ATC�ISf� NSERS: <br /> CFC 2010 §22063e 922 LOCATION 1, Al L. INSTALLATIONS OF VEEDER ROOT CARBON CANISTER VAPOR POLISHER <br /> IN>TA[_(_ATIC)N`~> SHALL E.3Em REVIEWED BY SEF' LOGISTICS FOR A,[�'PROVAL.. 1. �C)ME�: DISPENSER NOZZLES HOLSTERS ARE NOT tw;UMF'Af IC-3C,.[W WITH THE: <br /> CURRENT VST DESIGN, C:,ONSI.IL_T` WITH BP PROJECT' MANAGER FOR A LIST <br /> EQUIPMENT VAPOR- PROCESSING EQUIPMENT SHALE.. BE LOCATED AF OR ABOVE PRIOR TO SUBMITTALS TO AUTHORITIES HAVING JURISDICTION AND - S _. _ <br /> __._.T RE---REVIEWED BY PP LOGISTICS AF=TER PERMIT APPROVALS ARE OBTAINED, IN DISPENSERS AT' 1HAT ION NOT E -THESE <br /> WITH THE DESIGN AND 1)O NOT Ad <br /> GRAE)E:rr, SOURCES OF IGNITION SHALL BE L..0?t:�A[ED NOT` LESS TI�IAN Ci C) FEET SITE PLANS _ _ INSTALL. VST Ai' I_.(1CAC1C)NS WHERE -[HE`"- <br /> (15240MM) FROM FUEL---1RANSFER AREAS AND NOT LESS �1'HAN 18 INCHES ADDITIONALI._Y INDIVIDUAL SITE PLANS NEED TO BE". REVIEWED BY THE ECS >E C)ISFEN�LR� EXIST. <br /> IN <br /> TO MAKE SURE THERE ARE. NO SENSITIVE RECEPTORS WITHIN 1000 FEET <br /> (457.2MM) ABOVE -TANK FIL.d... OPENINGS AND TOPS CES DISPENSER ISLANDS. OE=� TE--IEE. EQUIPMENT LOCATION. 2. THE PRESSURE SENSOR LOCATED IN ]FIE DISPENSER SUMP CLOSEST TO <br /> THE TANK FARM SHAI..-L.. BE PREFERABLY MOUNTED OUTSIDE THE: DISPENSER <br /> VAPOR--PROCESSING UNITS SHAI.,.L BE L.00AI E D NOT I ESS THAN 10 FEET a r CONTAINMENT SUMP OR ABOVE THE. HIGHEST PENETRATION FITTING.1 <br /> _ �., ON EAiS[IN�., FACILITIE.a CC)NT�FTAC-TOR TO F'EE:f7FCLRM E_IOE.11D AND VAPOR � SUMP ,._ - ... , _ <br /> DURING <br /> (3048MM) FROM THE NEAREST BUILDING OR PROPERTY LINE OF A PROPERTY c <br /> CONTAINMENT aIJMF CE.RFIFEC,AFIOPJ TESTING CONTRACTOR TO REMOVE: ilaE <br /> TIGEETNE: ., TEST ON VEE I F C.INE:,,a PRIOR R T(1 PROCEEDING WITH{ INSTAC..I.ATION PRESSURE. SWITCH TO AVOID POSSIBLE WATER DAMAGE. ARCO <br /> WIIIC;Ef CAN E3 FE F�U1E,:F UPON, OE: THE VEEDER ROOT SYSTEM, REPORT �TO ETP PRODUCT MANAGER WITH <br /> � �PwEsrca�ST�RaDucTS,E(.c <br /> LINES OR FUEL WHER;F-.E REQUIRED DISTANCES TO BUILDINGS, PROPERTY � � ��� <br /> EXCEPT-ION: WEIEMfTE Tf1E REQ �, <br /> RE:�ULIS. � <br /> E_ E AREAS CANNOT BE OBTAINCE D, MEANS SHALL ESE:. <br /> THE PRESSURE SENSOR MUST BE INSTALLED IN THE VERTICAL POSITION, <br /> PROVIDED TO PROTECT EQUIPMENT AGAINST FIRE EXPOSURE. ACCEPTABLE- 3. THE VENT DISCHAR(:E `.SHALT_ BE LOCATED AND DIRECTED SENSING PORT POINTING DOWN, AND lNITEN E�EC)I.IIRED E3Y" AUTHORITY HAVING <br /> E.C. C..[..) SO THAT LYJURISDICTION, THE CONNFCFION TO THE VAPOR LINE ME.J`.ST BE BELOW THE <br /> MEANS INCLUDES' 1hd11_L, DISPERSE. VAPORS SHAI..I.. BE L)IREt;TFI) I.1PINARLT AND FT{)E,110EJTAI...I..Y <br /> C aSURES, WHICH EXTEND AT LEASE 18 AWAY FROM ADJACENT WALLS, VENT OUTLETS SHALL_ BE LOCATED SO AS SHEAR VALVE <br /> INCHES 4.57, .MM ABOVE THE EQU IF MENT, CONSTRUCTED OF FIRE--RE:SISIANi� NOT TO BE TRAPPED BY EAVES <br /> . APPROVED {�(�C?TEEC;EIJE ENCLOSURES, <br /> ( � ) "� - � -� � OR OTHE=R OBSTRUCTIONS AND SHAL.I_. BE <br /> OR NON COMBUSTIBLE MATERIALS OR AT LEAST 5 FEET FROM BUILDING OPENINGS. DISCHARGE. SHAI....E_ NOT BE 4, 11IE 3 -WAY VALVE FEST PORT ON THE PRESSURE SENSOR IN THE <br /> 2. FIRE PROTECTION USING AN APPROVED WATER__-SPRAY SYSTEM. LESS THAN '12' FROM FINISH GRADE, VENTS c" E)ISPENS[:ER CLOSEST TO THE TANK FARM SHALL BE "CAR SEALED" WITH IT <br /> ENFS FIAE...E_ BE INSTALLED IN <br /> ACCORDANCE. WITH NEPA 30 (2C)1'2). LABELS INDICATING CORRECT OPERATING POSITION, VALVE CO REMAIN <br /> VAPOR--PROCESSING EQUIPMENT' SHALL BE LOCATED A. MINIMUM OF 20 FEET C�C.C)SED FOR NORMA(_ OPERATION TO AVOID E=AL.:aE PRESSURE READING BY <br /> (6096MM) FROM DISPENSING DEVICES. PROCESSING EQUIPMENT SHALL BE 4, VENT RISERS SHOULD STAND NO LESS FHAN 3' FROM THE OUTSIDE OFTHE ISD SOF_f'WARE. <br /> PROTECTED AGAINST PHYSICAL DAMAGE BY GUARDRAILS, CURBS, PROTECTIVE CURB, <br /> `S. THE DISPENSERS MUST BE A BALANCE -TYPE DISPENSER,ENC;L.OSLII�'F`S OR FENCING, WHEN APPROVEDf='IFC)FF:CaTIVE EN( EC)`yURE:> ARE <br /> USED, APPROVED MEANS SHALL, BE PROVIDED TO VENTILATE THE: VOLUME 5. THE CONTRACTOR IS RESPONSIBLE: FOR SNORING T�AND D THE PROTECTION IN C, THE DISPENSERS MUST BE CA[FF3 APPROVED UNIFTC)SE:. TYPES UNLESS <br /> WITHIN THE ENCLOSURE TG PREVENT POCKETING OF FLAMMABLE VAPORS. PLACE OF EXISTING FA(.;ll_ITII��S. � � <br /> IF' A DOWNSLOPE EXfST``�S TOWARD TFII=: LC)CA1��IC)N OF THE VAPOR__f-'RO(;E.SSINCT C. MAINTAIN 5 FCwE'f Cl EAR AROUND �., c E ERMITTC.D E31 AUTHORITY HAVING JURISDICTION, - <br /> a E <br /> UNI' A ROUND CARBON CANISTER VAPOR POLISHER - <br /> T FROM A FUEL--TRANSFER AREA, THE CHIEF IS AUTHORIZED 1-0 REQUIRE) 7. 1NEF�E SEIAII_ E3f N(:) Fl OW LIMITERS A[LOWED FOR fl{E V`>T` .SY�TE.:M. It3215 7 Nf) AVENUE SOUTH <br /> FOOTPRINT FC) CSRADE. <br /> ADDITIONAL_ SE PARAI ION BY DISTANCE AND HF_IGHIF, E'1821 WA DE30 32 <br /> 7, NOT USED C3. FOLLOW PEI RF'--�C)�J FOR ELECTRICAL CONTINUITY C:7F E-{ANGING HARC)WARE: <br /> CFC 2010 22UCa.7, "2.3 INSTALLATION _.__ <br /> VAT OR-('fEOC;I�TSING UNhi�`T `HALL_ BE SECURELYMOUNTED ON C10NCREfE , E3. r C3). ]"HE VST HAN(,ING HARDWARE: HAS THE OPTION OF' LONGER HOSE: LENGTHS, (425)251 -6222 <br /> ONTRACTOR SHALL CONFIRM AND LABEL ALL VENT STACKS WITH CORRECT <br /> MAXIMUM HOSE l._EP"d(:,TH 'dVEIEEN CONNECTED IS LIMITED TO 1 .>r. <br /> Cl C.,O N S lwJ 11� (425)L?01-E3 r'82 FAX <br /> MASONY ORS[RUCTURAL. STEEL SUPPORTS ONCONCRETETE OR GTL-{ESR PRODUCT VENT TIE IN 10 AVOID PRODUCT CONTAMINATION AND IMPROPER .... <br /> TANK C <br /> AN <br /> TIF---IN. PWITH DISPENSER MANUFACTURER FOR EXTENDED HOSE. REACH DESIGN CIVIL ENGINEERING, LAND PLANNING, <br /> NON---CC7ME:3USFIEEP..E FOUNDATIONS,FOUNDATIONS, PROCESSOPROVIDE CONFIRMATION ON PIPE FIECKPIST.... OPTION, SURVEYING, ENVIRONMENTAL. SERVICES <br /> (l_AE3E:E_ MAKER C)EC). "OC) NO [N`w;TAE_E_ ON DIESEL" <br /> NOTE: E3,E? _E)C)F_ _ NOT ..r PERMIT THE vA ??R mf�ot e��>iNC_ UII r�EmNr r�:�_EE <br /> INSiAI_L_Cl7 ONROC)F a 01"_E3UILmE)ING�, U CANOPY S=fN lltTll) f ___`_>.LF1­AL1hc NATE 91 <br /> , THERE SHALL BE NO POCKETS OR LIQUID 'TRAPS IN ANY OE THE TESTING NOCESm <br /> NO, DATE REVISION 1:1ESCRIF"'TiC1N <br /> MOUNTING DETAILS FOR EXISTING, SIFES S Wf-1EREr_._VENT_RISERS--_ARMOUNTED AT.. CONNECTED F'ih'ING FROM THE VEEDER ROOT CARBON C;ANISI ER VAPOR ,. <br /> 4/17 PERMIT SUBMITTAL <br /> ROOFS, <br /> POLISHER r0 ..1.1..1E VENT STACKTIE---IN POINT, PERPERCARES E.O. VR--2C)4 ALL EXISTING SINGLE WALL VENT AND \JAF'C)R PIPINGS Qs/2_ <br /> EXISIING..._GO,ND.I,TI( NS y IN.`.`aTAI,LAI-IONS AND NEW DOUBLE WALL VENT AND VAPOR INSTALLATIONS SHALL 09/06/17 CONSTRUCTION RELEASE <br /> ST 1C). THE. VENT SFACK RACK AND RISERS SHALL BE GROUNDED, TIE:. THE: HAVE THE FOLLOWING 'TESTS TO BE COMPLETED WITHIN C � <br /> C"FIE CONTRACTOR SETAL.I_ E3ET RESPONSIBLE FOR DETERMININt� THE EXISTING u __.. <br /> 0 DAY AFTER L ' 10/10/17 REV. PER EHD PLAN CHECK <br /> t GRC)IJNIa) WIRE:. FROM TE1E VENT ;:>IA(,"K`S TO TETE UST SYSTEM GROUND. START---UP AND AT E_EAST ONCE IN EACH 12 MONTH PERIOD USING THE <br /> CONTROLLING S1TC. C)C?ND11lONU AND FC�fr COMPLIANCE WITH I_,O(;AI.w ORDINANCES <br /> .. tFOLLOWING TEST'` PROCEDURES,. /17/17 REV. PER EHD PIAN CHECK <br /> AND C,'URE�'E:N1 CALIFORNIA BUILDING ( 0E)ES. 11. PRIOR TO PERFORMING MAINTENANCE, TE`.E1m PORI' VALVE: MUST BE VENTED <br /> APPUCALIC,C?DE�.�;. <br /> TO ATMOSPHERE, TP--201.3TP--201.3 DETERMINATION OF 2--INCH WC STATIC PRESSURE. <br /> 01/15/18 REV. PER EHD PIAN CHECK <br /> Al L. WORK SHALL- ETES IN STRICT ACCORDANCE" WITH THE l.r'tfF`)T EDITION OF _ _ _- <br /> PERFORMANCE_ OF' VAPOR RECOVERY SYSTEMS OF DISPENSING FACILITIEmS - <br /> ]HE CALIFORNIA f.3Uil_DIP�G CODE AND fTE�FEREN(;L-EL) STANDARDS, 12. VEEDER RC)C)I- SYSTEM TO EASE LEAK-TEs`>TE::D F'[21OR TO STAfFh-CJf' TO AVCJ{Cw) (March 17, 19C3�)); <br /> 01/25/18 REV. FIER EHD PLAN CHECK <br /> E_EAKAOE TO ATMOSPHERE, <br /> 02/19/18 REVPER PLANS AND PERMITS: � a_ .. � _ TREATED T�P__.201.4 DYNAMIC BACK PRESSURE (July 3„ 2002) IN AC'COITDANCE: <br /> 13. ANY S E...N T CARBON FROM CANISTER SHALL.. BEm I REAL ED A S HAZARDOUS "[TIE CONDITION LISTED - VAPOR o4/1sf18 CONSTRUCTION RCLANAc�ecK <br /> TETE:, CONTRACTOR SHALL OB ALL. NECESSARY ENCROACHMENT PERMIT'S AN[) WITH [TIE_ C.�NDI ION LISTED IN ITEM 1 OF THE VAPOR C'OL.LECTION <br /> SFiAI.I_ POSSESS Af'f'Rt)VE:C) F'fANs PRI(JR TO BEGINNING OF' CONSTRUCTION. <br /> WASTE AND DISPOSED OF PROPERLY SECTION OFEXHIBIT 2 OF THE VR.-204 EXECUTIVE ORDER; IN ADDITION � 05/22/18 REV. PER C1ENT <br /> UTILITY LOCATIONS: ESP PROCEDURES REQUIRE THE EXECUTION OF METHODOLOGY E3 <br /> 14. INSPECT FOR VEEDER ROOT CARBON CANISTER VAPOR F'(.)L!`.aHER FOR <br /> THE CONTRACTOR WILL BE REQUIRED 1-0 NOTIFY MEMBERS OF UNDERGROUND DAMAGE. PRIOR TO START UP OR RE--COMMISIONING AFTER SERVICE.. EXHIBIT 4 OF THE: VR-204 EXECUTIVE ORDER, REQUIRED ITEMS IN <br /> CONDUCTING TP_-2t)1,3; <br /> 1 <br /> SERVICE ALTERU.S.A 48 HOURS IN ADVANCE OF PERFORMING EXCAVATION - -- <br /> 12 <br /> WORK BY CALLING TETE TOLL-FREE NkvJMkEELR (800)­­227­­2600, EXCAVATION SEAL: <br /> 5 OF TETE VR--204 EXECUTIVE. ORDER, LIQUID REMOVAL. TEST <br /> FORTE-1E h'UII�'.PC)`>E OF' THIS REQUIREMENT, IS DEFINED AS EYEING '1F3'° DEQ <br /> ME IN DEPTH BELOW TEE: EXISTING SURFACE. T_ ; <br /> PROCEDURE; <br /> �EIC� f�CALIN�lALltN NOTES: <br /> r � <br /> ; P Cw, � ti <br /> � <br /> EXHIBIT G OF THE. VR _2.04 E..XFECUTIVE. ORDER, HYDROCARBON SENSOR <br /> VE.FTIFICAT�(ON TEST; C <br /> 1. ALL ELECTRICAL INSTALLATIOINSTALLATIONSARE TO BE PER NI: C,/CEC CODE FOR THE � � i AL !D� <br /> AREA INSTALL ED, INSTALLATION IN A CLASSIFIED AAREA IS AN EXCEPTIONd � H P. CARE <br /> TO THE NORMAL T"SIIING AND SHALL REQUIRE FURTHER REVIEW OF FSE. <br /> E.XHIBIF E3 OF THP. VR--204 EXECUTIVE ORDER, VAPOR <br /> T V' <br /> 1'"RC?JF:CT MANAGER <br /> PRESSURE SENSOR VERIFICATION TEES F; <br /> 2. ENSURE THF: VEEDER ROOT CARBON CANISTER VAPOR POLISHER IS EXHIBIT 9 OF FHE VR---204 EXECUTIVE: ORDER, DETERMINATION OF VST <br /> BONDED AND GROUNDED TO THE SITE SYSTEM AND TO THE SITE TANK PROCESSOR ACTIVATION PRESSURE; <br /> GROUNDING CSYSTEM TO FL.IMINAIE THE POSSIBILITY OF Euh_ECTRICAL.. <br /> __\ <br /> DISCHARGE AS AN IGNITION SOURCE, AND EXHIBIT 11 OF THE' VR--204 EXECUTIVE ORDER, OPERABILITY TEST <br /> PROC3. BONDING AND GROUNDING: BONDING AND GROUNDINGS GUIDELINES FOR FDUE�E FOP, THE VEEDERROOF ISD FLOW METER, <br /> c 4�_ <br /> CONSTRUCTION REGARDING DISPENSINGEQUIPME::NT ARE:: TO BE IN PLACE SHORTER TIME.:: PERIODS MAY BE SPECIFIED IN ACCORDANCE WITH LOCAL .... _. �.. _ <br /> AND IN ACCORDANCE' 'WIEE1 1='ETRt;)L.EUh71 EQUIPMENT INSTITUTE (PEI). DISTRICT REQUIREMENTS. NOTIFICATION OF TESTING, AND SUBMITTAL OF TEST r <br /> RESULTS, SHALL.. BE DONE: IN ACCORDANCE WITH LOCAL DISTRICT ( � � <br /> „i of <br /> EENTDUANTTOLCESABISHED BY THAT DISTRICT,E -AETERNATIVETESTROC ` _II G pRECENT <br /> 7 <br /> VERSIONS OF TEiE <br /> TEST PROCEDURES LISTED ABOVE, MAY BE USED IF DETERMINED BY THE ARB <br /> EXECUTIVE OFFICER OR EXECUTIVE OFFICER DELEGATE, IN WRITING, TO '1'IEL[) <br /> r, <br /> EQUIVALENT RESULTES, IT IS FURTHER ORDERED THAT THE FOLLOWING <br /> REQUIREMENTS ART:', MACE A CONDITION OF' CERTIFICATION. -THE OWNER OR <br /> ORATOR OF' THE VST PHASE II EVR SYSTEM INCLUDING VEEDER--ROOF !SD <br /> c <br /> SHALL CONDUCT, AND PASS, THE FOLLOWING TESTS NO LATER THAN Cao DAYS E�EVEI.63MlEN"f iNFORMAnc>N; <br /> AFTER STARTUP USING THE.:: FOLLOWING TEST PROCEDURE: EXHIBIT '10, NOZZLE �n <br /> BAG TEST PROCEDURE, NOTIFICATION OF TESTING, AND SUBMITTAL.. OF TEST ARCO NTI <br /> RESULTS, SHALL, BE DONE IN ACCORDANCE WITH LOCAE. DISTRICT s,? <br /> REQUIREMENTS AND PURSUANT EO TE-IE POL ICIE.S ESTABLISHED BY THAT 3000 am/prn <br /> DISTRICT. ALTERNATIVE FEST PROCEDURES, INCLUDING MOST RECENT VERSIONS . <br /> OF THE TEST' f'ROf:;ED(,.IITES LISTED ABOVE, MAY BE USED IF' DETERMINED BY FUEL CANOPY <br /> / 6 WD's <br /> THE: ARES E:XEClJ1IVE. OFFICER OR EXECUTIVE OFFICER ()E LEGATE, IN WRITING, ,x) <br /> FO YIELD EQUIVALENT <br /> C) <br /> RESULTS, <br /> aTE AFFFi7F sS: _ r; <br /> C <br /> 6009 N. ELDORADO STREET <br /> r� <br /> @ W.SWAIN RD <br /> r_ <br /> STOCKTN,CALIFORNIA <br /> uT, <br /> BILI ,. <br /> faEr,IGNED BY,, ALLIANCE Z&DM: u:.• <br /> NP/RF DO r> <br /> CHECKED BY: RP REPM. <br /> CSV UES <br /> DRAIN BY: ALLIANCE PM; <br /> _NP RE <br /> VERSION: p PROJECT N0: <br /> 17866 CC) <br /> 06-10-2016 <br /> __ <br /> C?RAWING Tl'11.f.':; j <br /> DESIGN INTENT; VEEDER-ROOT <br /> CARBON CANISTER VAPOR POLISHER � <br /> COMPLIANCE AND INuALLUION NOTES <br /> (CALIFORNIA ONLY) <br /> SHEET N7� <br /> .r <br /> -u <br /> cU <br /> iXl <br /> Gci <br /> c? <br /> Gm0i,6m4 <br /> �C: <br />