bp
<br /> y
<br /> VEEDER ROOT CARBON CANISTER VAeOR eOLISHER
<br /> 'Zmm
<br /> COMeLIANCE AND INSTALLATION NOTES
<br /> THESE NOTES ARE APPLICABLE -1-0 NEW AND RETROFIT INSTALLATIONS
<br /> L()CAA_UL)N OF VAPOR Pf�C?CE:SSiNU E,Q.UIE MENT G/�Fi,f ( ?I TT AL7C)ITfC)NA_I�.INS>.;(ALLATtQN.._NOTES:
<br /> ADDITIONALr_INSTALLATION _NOTES_ ATC�ISf� NSERS:
<br /> CFC 2010 §22063e 922 LOCATION 1, Al L. INSTALLATIONS OF VEEDER ROOT CARBON CANISTER VAPOR POLISHER
<br /> IN>TA[_(_ATIC)N`~> SHALL E.3Em REVIEWED BY SEF' LOGISTICS FOR A,[�'PROVAL.. 1. �C)ME�: DISPENSER NOZZLES HOLSTERS ARE NOT tw;UMF'Af IC-3C,.[W WITH THE:
<br /> CURRENT VST DESIGN, C:,ONSI.IL_T` WITH BP PROJECT' MANAGER FOR A LIST
<br /> EQUIPMENT VAPOR- PROCESSING EQUIPMENT SHALE.. BE LOCATED AF OR ABOVE PRIOR TO SUBMITTALS TO AUTHORITIES HAVING JURISDICTION AND - S _. _
<br /> __._.T RE---REVIEWED BY PP LOGISTICS AF=TER PERMIT APPROVALS ARE OBTAINED, IN DISPENSERS AT' 1HAT ION NOT E -THESE
<br /> WITH THE DESIGN AND 1)O NOT Ad
<br /> GRAE)E:rr, SOURCES OF IGNITION SHALL BE L..0?t:�A[ED NOT` LESS TI�IAN Ci C) FEET SITE PLANS _ _ INSTALL. VST Ai' I_.(1CAC1C)NS WHERE -[HE`"-
<br /> (15240MM) FROM FUEL---1RANSFER AREAS AND NOT LESS �1'HAN 18 INCHES ADDITIONALI._Y INDIVIDUAL SITE PLANS NEED TO BE". REVIEWED BY THE ECS >E C)ISFEN�LR� EXIST.
<br /> IN
<br /> TO MAKE SURE THERE ARE. NO SENSITIVE RECEPTORS WITHIN 1000 FEET
<br /> (457.2MM) ABOVE -TANK FIL.d... OPENINGS AND TOPS CES DISPENSER ISLANDS. OE=� TE--IEE. EQUIPMENT LOCATION. 2. THE PRESSURE SENSOR LOCATED IN ]FIE DISPENSER SUMP CLOSEST TO
<br /> THE TANK FARM SHAI..-L.. BE PREFERABLY MOUNTED OUTSIDE THE: DISPENSER
<br /> VAPOR--PROCESSING UNITS SHAI.,.L BE L.00AI E D NOT I ESS THAN 10 FEET a r CONTAINMENT SUMP OR ABOVE THE. HIGHEST PENETRATION FITTING.1
<br /> _ �., ON EAiS[IN�., FACILITIE.a CC)NT�FTAC-TOR TO F'EE:f7FCLRM E_IOE.11D AND VAPOR � SUMP ,._ - ... , _
<br /> DURING
<br /> (3048MM) FROM THE NEAREST BUILDING OR PROPERTY LINE OF A PROPERTY c
<br /> CONTAINMENT aIJMF CE.RFIFEC,AFIOPJ TESTING CONTRACTOR TO REMOVE: ilaE
<br /> TIGEETNE: ., TEST ON VEE I F C.INE:,,a PRIOR R T(1 PROCEEDING WITH{ INSTAC..I.ATION PRESSURE. SWITCH TO AVOID POSSIBLE WATER DAMAGE. ARCO
<br /> WIIIC;Ef CAN E3 FE F�U1E,:F UPON, OE: THE VEEDER ROOT SYSTEM, REPORT �TO ETP PRODUCT MANAGER WITH
<br /> � �PwEsrca�ST�RaDucTS,E(.c
<br /> LINES OR FUEL WHER;F-.E REQUIRED DISTANCES TO BUILDINGS, PROPERTY � � ���
<br /> EXCEPT-ION: WEIEMfTE Tf1E REQ �,
<br /> RE:�ULIS. �
<br /> E_ E AREAS CANNOT BE OBTAINCE D, MEANS SHALL ESE:.
<br /> THE PRESSURE SENSOR MUST BE INSTALLED IN THE VERTICAL POSITION,
<br /> PROVIDED TO PROTECT EQUIPMENT AGAINST FIRE EXPOSURE. ACCEPTABLE- 3. THE VENT DISCHAR(:E `.SHALT_ BE LOCATED AND DIRECTED SENSING PORT POINTING DOWN, AND lNITEN E�EC)I.IIRED E3Y" AUTHORITY HAVING
<br /> E.C. C..[..) SO THAT LYJURISDICTION, THE CONNFCFION TO THE VAPOR LINE ME.J`.ST BE BELOW THE
<br /> MEANS INCLUDES' 1hd11_L, DISPERSE. VAPORS SHAI..I.. BE L)IREt;TFI) I.1PINARLT AND FT{)E,110EJTAI...I..Y
<br /> C aSURES, WHICH EXTEND AT LEASE 18 AWAY FROM ADJACENT WALLS, VENT OUTLETS SHALL_ BE LOCATED SO AS SHEAR VALVE
<br /> INCHES 4.57, .MM ABOVE THE EQU IF MENT, CONSTRUCTED OF FIRE--RE:SISIANi� NOT TO BE TRAPPED BY EAVES
<br /> . APPROVED {�(�C?TEEC;EIJE ENCLOSURES,
<br /> ( � ) "� - � -� � OR OTHE=R OBSTRUCTIONS AND SHAL.I_. BE
<br /> OR NON COMBUSTIBLE MATERIALS OR AT LEAST 5 FEET FROM BUILDING OPENINGS. DISCHARGE. SHAI....E_ NOT BE 4, 11IE 3 -WAY VALVE FEST PORT ON THE PRESSURE SENSOR IN THE
<br /> 2. FIRE PROTECTION USING AN APPROVED WATER__-SPRAY SYSTEM. LESS THAN '12' FROM FINISH GRADE, VENTS c" E)ISPENS[:ER CLOSEST TO THE TANK FARM SHALL BE "CAR SEALED" WITH IT
<br /> ENFS FIAE...E_ BE INSTALLED IN
<br /> ACCORDANCE. WITH NEPA 30 (2C)1'2). LABELS INDICATING CORRECT OPERATING POSITION, VALVE CO REMAIN
<br /> VAPOR--PROCESSING EQUIPMENT' SHALL BE LOCATED A. MINIMUM OF 20 FEET C�C.C)SED FOR NORMA(_ OPERATION TO AVOID E=AL.:aE PRESSURE READING BY
<br /> (6096MM) FROM DISPENSING DEVICES. PROCESSING EQUIPMENT SHALL BE 4, VENT RISERS SHOULD STAND NO LESS FHAN 3' FROM THE OUTSIDE OFTHE ISD SOF_f'WARE.
<br /> PROTECTED AGAINST PHYSICAL DAMAGE BY GUARDRAILS, CURBS, PROTECTIVE CURB,
<br /> `S. THE DISPENSERS MUST BE A BALANCE -TYPE DISPENSER,ENC;L.OSLII�'F`S OR FENCING, WHEN APPROVEDf='IFC)FF:CaTIVE EN( EC)`yURE:> ARE
<br /> USED, APPROVED MEANS SHALL, BE PROVIDED TO VENTILATE THE: VOLUME 5. THE CONTRACTOR IS RESPONSIBLE: FOR SNORING T�AND D THE PROTECTION IN C, THE DISPENSERS MUST BE CA[FF3 APPROVED UNIFTC)SE:. TYPES UNLESS
<br /> WITHIN THE ENCLOSURE TG PREVENT POCKETING OF FLAMMABLE VAPORS. PLACE OF EXISTING FA(.;ll_ITII��S. � �
<br /> IF' A DOWNSLOPE EXfST``�S TOWARD TFII=: LC)CA1��IC)N OF THE VAPOR__f-'RO(;E.SSINCT C. MAINTAIN 5 FCwE'f Cl EAR AROUND �., c E ERMITTC.D E31 AUTHORITY HAVING JURISDICTION, -
<br /> a E
<br /> UNI' A ROUND CARBON CANISTER VAPOR POLISHER -
<br /> T FROM A FUEL--TRANSFER AREA, THE CHIEF IS AUTHORIZED 1-0 REQUIRE) 7. 1NEF�E SEIAII_ E3f N(:) Fl OW LIMITERS A[LOWED FOR fl{E V`>T` .SY�TE.:M. It3215 7 Nf) AVENUE SOUTH
<br /> FOOTPRINT FC) CSRADE.
<br /> ADDITIONAL_ SE PARAI ION BY DISTANCE AND HF_IGHIF, E'1821 WA DE30 32
<br /> 7, NOT USED C3. FOLLOW PEI RF'--�C)�J FOR ELECTRICAL CONTINUITY C:7F E-{ANGING HARC)WARE:
<br /> CFC 2010 22UCa.7, "2.3 INSTALLATION _.__
<br /> VAT OR-('fEOC;I�TSING UNhi�`T `HALL_ BE SECURELYMOUNTED ON C10NCREfE , E3. r C3). ]"HE VST HAN(,ING HARDWARE: HAS THE OPTION OF' LONGER HOSE: LENGTHS, (425)251 -6222
<br /> ONTRACTOR SHALL CONFIRM AND LABEL ALL VENT STACKS WITH CORRECT
<br /> MAXIMUM HOSE l._EP"d(:,TH 'dVEIEEN CONNECTED IS LIMITED TO 1 .>r.
<br /> Cl C.,O N S lwJ 11� (425)L?01-E3 r'82 FAX
<br /> MASONY ORS[RUCTURAL. STEEL SUPPORTS ONCONCRETETE OR GTL-{ESR PRODUCT VENT TIE IN 10 AVOID PRODUCT CONTAMINATION AND IMPROPER ....
<br /> TANK C
<br /> AN
<br /> TIF---IN. PWITH DISPENSER MANUFACTURER FOR EXTENDED HOSE. REACH DESIGN CIVIL ENGINEERING, LAND PLANNING,
<br /> NON---CC7ME:3USFIEEP..E FOUNDATIONS,FOUNDATIONS, PROCESSOPROVIDE CONFIRMATION ON PIPE FIECKPIST.... OPTION, SURVEYING, ENVIRONMENTAL. SERVICES
<br /> (l_AE3E:E_ MAKER C)EC). "OC) NO [N`w;TAE_E_ ON DIESEL"
<br /> NOTE: E3,E? _E)C)F_ _ NOT ..r PERMIT THE vA ??R mf�ot e��>iNC_ UII r�EmNr r�:�_EE
<br /> INSiAI_L_Cl7 ONROC)F a 01"_E3UILmE)ING�, U CANOPY S=fN lltTll) f ___`_>.LF1AL1hc NATE 91
<br /> , THERE SHALL BE NO POCKETS OR LIQUID 'TRAPS IN ANY OE THE TESTING NOCESm
<br /> NO, DATE REVISION 1:1ESCRIF"'TiC1N
<br /> MOUNTING DETAILS FOR EXISTING, SIFES S Wf-1EREr_._VENT_RISERS--_ARMOUNTED AT.. CONNECTED F'ih'ING FROM THE VEEDER ROOT CARBON C;ANISI ER VAPOR ,.
<br /> 4/17 PERMIT SUBMITTAL
<br /> ROOFS,
<br /> POLISHER r0 ..1.1..1E VENT STACKTIE---IN POINT, PERPERCARES E.O. VR--2C)4 ALL EXISTING SINGLE WALL VENT AND \JAF'C)R PIPINGS Qs/2_
<br /> EXISIING..._GO,ND.I,TI( NS y IN.`.`aTAI,LAI-IONS AND NEW DOUBLE WALL VENT AND VAPOR INSTALLATIONS SHALL 09/06/17 CONSTRUCTION RELEASE
<br /> ST 1C). THE. VENT SFACK RACK AND RISERS SHALL BE GROUNDED, TIE:. THE: HAVE THE FOLLOWING 'TESTS TO BE COMPLETED WITHIN C �
<br /> C"FIE CONTRACTOR SETAL.I_ E3ET RESPONSIBLE FOR DETERMININt� THE EXISTING u __..
<br /> 0 DAY AFTER L ' 10/10/17 REV. PER EHD PLAN CHECK
<br /> t GRC)IJNIa) WIRE:. FROM TE1E VENT ;:>IA(,"K`S TO TETE UST SYSTEM GROUND. START---UP AND AT E_EAST ONCE IN EACH 12 MONTH PERIOD USING THE
<br /> CONTROLLING S1TC. C)C?ND11lONU AND FC�fr COMPLIANCE WITH I_,O(;AI.w ORDINANCES
<br /> .. tFOLLOWING TEST'` PROCEDURES,. /17/17 REV. PER EHD PIAN CHECK
<br /> AND C,'URE�'E:N1 CALIFORNIA BUILDING ( 0E)ES. 11. PRIOR TO PERFORMING MAINTENANCE, TE`.E1m PORI' VALVE: MUST BE VENTED
<br /> APPUCALIC,C?DE�.�;.
<br /> TO ATMOSPHERE, TP--201.3TP--201.3 DETERMINATION OF 2--INCH WC STATIC PRESSURE.
<br /> 01/15/18 REV. PER EHD PIAN CHECK
<br /> Al L. WORK SHALL- ETES IN STRICT ACCORDANCE" WITH THE l.r'tfF`)T EDITION OF _ _ _-
<br /> PERFORMANCE_ OF' VAPOR RECOVERY SYSTEMS OF DISPENSING FACILITIEmS -
<br /> ]HE CALIFORNIA f.3Uil_DIP�G CODE AND fTE�FEREN(;L-EL) STANDARDS, 12. VEEDER RC)C)I- SYSTEM TO EASE LEAK-TEs`>TE::D F'[21OR TO STAfFh-CJf' TO AVCJ{Cw) (March 17, 19C3�));
<br /> 01/25/18 REV. FIER EHD PLAN CHECK
<br /> E_EAKAOE TO ATMOSPHERE,
<br /> 02/19/18 REVPER PLANS AND PERMITS: � a_ .. � _ TREATED T�P__.201.4 DYNAMIC BACK PRESSURE (July 3„ 2002) IN AC'COITDANCE:
<br /> 13. ANY S E...N T CARBON FROM CANISTER SHALL.. BEm I REAL ED A S HAZARDOUS "[TIE CONDITION LISTED - VAPOR o4/1sf18 CONSTRUCTION RCLANAc�ecK
<br /> TETE:, CONTRACTOR SHALL OB ALL. NECESSARY ENCROACHMENT PERMIT'S AN[) WITH [TIE_ C.�NDI ION LISTED IN ITEM 1 OF THE VAPOR C'OL.LECTION
<br /> SFiAI.I_ POSSESS Af'f'Rt)VE:C) F'fANs PRI(JR TO BEGINNING OF' CONSTRUCTION.
<br /> WASTE AND DISPOSED OF PROPERLY SECTION OFEXHIBIT 2 OF THE VR.-204 EXECUTIVE ORDER; IN ADDITION � 05/22/18 REV. PER C1ENT
<br /> UTILITY LOCATIONS: ESP PROCEDURES REQUIRE THE EXECUTION OF METHODOLOGY E3
<br /> 14. INSPECT FOR VEEDER ROOT CARBON CANISTER VAPOR F'(.)L!`.aHER FOR
<br /> THE CONTRACTOR WILL BE REQUIRED 1-0 NOTIFY MEMBERS OF UNDERGROUND DAMAGE. PRIOR TO START UP OR RE--COMMISIONING AFTER SERVICE.. EXHIBIT 4 OF THE: VR-204 EXECUTIVE ORDER, REQUIRED ITEMS IN
<br /> CONDUCTING TP_-2t)1,3;
<br /> 1
<br /> SERVICE ALTERU.S.A 48 HOURS IN ADVANCE OF PERFORMING EXCAVATION - --
<br /> 12
<br /> WORK BY CALLING TETE TOLL-FREE NkvJMkEELR (800)2272600, EXCAVATION SEAL:
<br /> 5 OF TETE VR--204 EXECUTIVE. ORDER, LIQUID REMOVAL. TEST
<br /> FORTE-1E h'UII�'.PC)`>E OF' THIS REQUIREMENT, IS DEFINED AS EYEING '1F3'° DEQ
<br /> ME IN DEPTH BELOW TEE: EXISTING SURFACE. T_ ;
<br /> PROCEDURE;
<br /> �EIC� f�CALIN�lALltN NOTES:
<br /> r �
<br /> ; P Cw, � ti
<br /> �
<br /> EXHIBIT G OF THE. VR _2.04 E..XFECUTIVE. ORDER, HYDROCARBON SENSOR
<br /> VE.FTIFICAT�(ON TEST; C
<br /> 1. ALL ELECTRICAL INSTALLATIOINSTALLATIONSARE TO BE PER NI: C,/CEC CODE FOR THE � � i AL !D�
<br /> AREA INSTALL ED, INSTALLATION IN A CLASSIFIED AAREA IS AN EXCEPTIONd � H P. CARE
<br /> TO THE NORMAL T"SIIING AND SHALL REQUIRE FURTHER REVIEW OF FSE.
<br /> E.XHIBIF E3 OF THP. VR--204 EXECUTIVE ORDER, VAPOR
<br /> T V'
<br /> 1'"RC?JF:CT MANAGER
<br /> PRESSURE SENSOR VERIFICATION TEES F;
<br /> 2. ENSURE THF: VEEDER ROOT CARBON CANISTER VAPOR POLISHER IS EXHIBIT 9 OF FHE VR---204 EXECUTIVE: ORDER, DETERMINATION OF VST
<br /> BONDED AND GROUNDED TO THE SITE SYSTEM AND TO THE SITE TANK PROCESSOR ACTIVATION PRESSURE;
<br /> GROUNDING CSYSTEM TO FL.IMINAIE THE POSSIBILITY OF Euh_ECTRICAL..
<br /> __\
<br /> DISCHARGE AS AN IGNITION SOURCE, AND EXHIBIT 11 OF THE' VR--204 EXECUTIVE ORDER, OPERABILITY TEST
<br /> PROC3. BONDING AND GROUNDING: BONDING AND GROUNDINGS GUIDELINES FOR FDUE�E FOP, THE VEEDERROOF ISD FLOW METER,
<br /> c 4�_
<br /> CONSTRUCTION REGARDING DISPENSINGEQUIPME::NT ARE:: TO BE IN PLACE SHORTER TIME.:: PERIODS MAY BE SPECIFIED IN ACCORDANCE WITH LOCAL .... _. �.. _
<br /> AND IN ACCORDANCE' 'WIEE1 1='ETRt;)L.EUh71 EQUIPMENT INSTITUTE (PEI). DISTRICT REQUIREMENTS. NOTIFICATION OF TESTING, AND SUBMITTAL OF TEST r
<br /> RESULTS, SHALL.. BE DONE: IN ACCORDANCE WITH LOCAL DISTRICT ( � �
<br /> „i of
<br /> EENTDUANTTOLCESABISHED BY THAT DISTRICT,E -AETERNATIVETESTROC ` _II G pRECENT
<br /> 7
<br /> VERSIONS OF TEiE
<br /> TEST PROCEDURES LISTED ABOVE, MAY BE USED IF DETERMINED BY THE ARB
<br /> EXECUTIVE OFFICER OR EXECUTIVE OFFICER DELEGATE, IN WRITING, TO '1'IEL[)
<br /> r,
<br /> EQUIVALENT RESULTES, IT IS FURTHER ORDERED THAT THE FOLLOWING
<br /> REQUIREMENTS ART:', MACE A CONDITION OF' CERTIFICATION. -THE OWNER OR
<br /> ORATOR OF' THE VST PHASE II EVR SYSTEM INCLUDING VEEDER--ROOF !SD
<br /> c
<br /> SHALL CONDUCT, AND PASS, THE FOLLOWING TESTS NO LATER THAN Cao DAYS E�EVEI.63MlEN"f iNFORMAnc>N;
<br /> AFTER STARTUP USING THE.:: FOLLOWING TEST PROCEDURE: EXHIBIT '10, NOZZLE �n
<br /> BAG TEST PROCEDURE, NOTIFICATION OF TESTING, AND SUBMITTAL.. OF TEST ARCO NTI
<br /> RESULTS, SHALL, BE DONE IN ACCORDANCE WITH LOCAE. DISTRICT s,?
<br /> REQUIREMENTS AND PURSUANT EO TE-IE POL ICIE.S ESTABLISHED BY THAT 3000 am/prn
<br /> DISTRICT. ALTERNATIVE FEST PROCEDURES, INCLUDING MOST RECENT VERSIONS .
<br /> OF THE TEST' f'ROf:;ED(,.IITES LISTED ABOVE, MAY BE USED IF' DETERMINED BY FUEL CANOPY
<br /> / 6 WD's
<br /> THE: ARES E:XEClJ1IVE. OFFICER OR EXECUTIVE OFFICER ()E LEGATE, IN WRITING, ,x)
<br /> FO YIELD EQUIVALENT
<br /> C)
<br /> RESULTS,
<br /> aTE AFFFi7F sS: _ r;
<br /> C
<br /> 6009 N. ELDORADO STREET
<br /> r�
<br /> @ W.SWAIN RD
<br /> r_
<br /> STOCKTN,CALIFORNIA
<br /> uT,
<br /> BILI ,.
<br /> faEr,IGNED BY,, ALLIANCE Z&DM: u:.•
<br /> NP/RF DO r>
<br /> CHECKED BY: RP REPM.
<br /> CSV UES
<br /> DRAIN BY: ALLIANCE PM;
<br /> _NP RE
<br /> VERSION: p PROJECT N0:
<br /> 17866 CC)
<br /> 06-10-2016
<br /> __
<br /> C?RAWING Tl'11.f.':; j
<br /> DESIGN INTENT; VEEDER-ROOT
<br /> CARBON CANISTER VAPOR POLISHER �
<br /> COMPLIANCE AND INuALLUION NOTES
<br /> (CALIFORNIA ONLY)
<br /> SHEET N7�
<br /> .r
<br /> -u
<br /> cU
<br /> iXl
<br /> Gci
<br /> c?
<br /> Gm0i,6m4
<br /> �C:
<br />
|