Laserfiche WebLink
iota * !;qFIS <br /> ENN4NCED LEAK D[TECTIDN <br /> Final ELD Test Project Worksheet <br /> Final Test Date: 10/25/2018 IOTA Technicians: Sergio L.Nunez <br /> Site Information Installation Contractor IMonhation <br /> Facility: Arca Customer Name/CA Contractor's License#: Town&Country Contractors <br /> Add s: 6009 N.EI Dorado St. Address: 3181 Luyung Dr.pA <br /> City,State,Zip: Stockton,CA City,Stale,Zip: Rancho Cordova,CA 95742 <br /> County: San Joaquin Contact: Sean Murphy <br /> CUPA Contact: San Joaquin Valley Environmental Health Phone/Email: 916-636-9500/sean@tccontractors.com <br /> COPA Phone/Email: ust@sjcehd.com <br /> TANKS <br /> Tank No. Ca acit al. Product T e Manufacturer Brine Test Result <br /> Tank 1 25,000 870ctane DW Fiberglass Xerxes Yes PASS <br /> Tank 2 12,000 91 Octane DW Fiberglass Xerxes Yes PASS <br /> Tank 3 10,000 Diesel DW Fiberglass Xerxes Yes PASS <br /> COMPONENTS IN CONTAINMENT <br /> Tank Top Sums Diameter in. Depth in. Volume al. Description Test Result <br /> S1 48 66 517.02 87 TS PASS <br /> S2 48 66 517.02 87 FS PASS <br /> S3 48 66 517.02 91 TS PASS <br /> S4 42 66 395.84 91 FS PASS <br /> S5 48 66 517.02 DSL TS PASS <br /> S6 42 66 395.84 DSL FS PASS <br /> Junction Boxes with Tank Connection Description Test Result <br /> S1 Tank Probe and Turbine J-Box Open During Test PASS <br /> S3 Tank Probe and Turbine J-Box Open During Test PASS <br /> S5 Tank Probe and Turbine J•Box Open During Test PASS <br /> UDCs Len in. Width in. Depth in. Volume I. Description Test Result <br /> UDC1 42 22 36 144.00 Bravo PASS <br /> UDC2 42 22 36 144.00 Bravo PASS <br /> UDC3 42 22 36 144.00 Bravo PASS <br /> UDC4 42 22 36 144.00 Bravo PASS <br /> UDCS 42 22 36 144.00 Bravo PASS <br /> UDC6 42 22 36 144.00 Bravo PASS <br /> Transition sump Len th in. Width in. Depth in. Volume al. Description Test Result <br /> TS1 24 22 36 82.29 Bravo PASS <br /> PIPING <br /> Product Piping Manufacturer Type <br /> Size in. Length ft. Test Result <br /> 87 PL A.O.Smith DW Fiberglass 2 250 PASS <br /> 91 PL A.O.Smith DW Fiberglass 2 240 PASS <br /> DSL PL A.O.Smith DW Fiberglass 2 230 PASS <br /> Vent Piping Manufacturer Type Size in. Len ft. TestResult <br /> 87 Vent A.O.Smith DW Fiberglass 2 110 PASS <br /> 91 Vent A.O.Smith DW Fiberglass 2 100 PASS <br /> DSL Vent A.O.Smith DW Fiberglass 2 85 PASS <br /> Va or Piping Manufacturer Type Size in. Length ft. Test Result <br /> VR A.O.Smith OW Fiberglass 3 260 PASS <br /> Leak Logs/Repair <br /> 10/26/2018 ^��7"�� a 06-1727 10/25/2018 <br /> Reviewed By Date 10 A ech SignatureR E <br /> !"LL'"' <br /> ® Date <br /> OCT 3 0 2018 <br /> ENVIRONMENTAL HEALTH <br /> DEPARTMENT <br />