My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
6009
>
2300 - Underground Storage Tank Program
>
PR0542116
>
INSTALL_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2020 3:23:12 PM
Creation date
7/23/2020 1:45:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0542116
PE
2351
FACILITY_ID
FA0024188
FACILITY_NAME
GRIN INVESTMENTS INC DBA: ARCO AM/PM
STREET_NUMBER
6009
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95207
APN
08126064
CURRENT_STATUS
01
SITE_LOCATION
6009 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
653
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CanvienaaE ComPlenona <br /> Fiber Glass Systems I K�lY ProdaetienSWanonR Fiber(Glass Systems I MY Roductlonadmbna ' <br /> HeJndi'o kekef, has successfully completed �pyt Car105 ESOUr2A has successfully completed <br /> Bonder Training as ski forth in the NOV Fiber Glass SystemsTotal Bonder Training as set forth in the NOV Fiber Glass Systems'TOtsl <br /> Quality Installation Program for the installation of UL listed primary Quality Installation Program for the installation of UL listed primary <br /> and secondary containment products. and secondary containment products. <br /> ULd Thread IIA &3 ML&4 WLCX L/l&ld 4ndRed Thread IIA U0300043000LCX <br /> Primary and Secondary Containment Systems Date Primary and Secondary Contai ment Systems Date <br /> Renewal of the bonder training is recommended evm three years RcncNval of the bonder training is recommended every three years <br /> or when the bonding prouss has aot been practiced for a period of 6 months. or when the bonding process has not been practiced for a period of 6 months. <br /> Fiber Glass Systems I K'Y°O1eP�fivn& <br /> Fiber Glass Systems I K'Yi=khrucnu i <br /> I_ 1 Pradueeonaoludons RQ(6:1 fir,! _ — has successfully completed <br /> Z uy't`'QQ Q has successfully completed BonderTmining as set forth in the NOV Fiber Glass Systems'Total <br /> Bonder Training as set forth in IV NOV Fiber Glass Systems'Total Quality Installation Program for the installation of Misted primary <br /> Quality Installation Program for the installation of UL listed primary and secondary containment products. <br /> and secondary containment products. / �[I <br /> ,�// �// ,�// ORed ThreadllA E30001- 3000LCX 6 <br /> UORed Thread IIA U3000L LL3000LCX Primary and Secondary Containment Systems Date <br /> Primary and Secondary Containment Systems Date <br /> Renewal of the bonder mining is recommended every three years <br /> Renewal of the bonder training is recommended eve three <br /> or when the bonding every years or when the bonding process has not been practiced for a period of 6 months. <br /> g process has not been practiced for a period of 6 months. <br /> Fiber Glass Systems I K'Y .M-,4UU,", <br /> / <br /> f 1 I Iqu [ PIA has successfully completed <br /> BondeNl'mining as sef{'orth in the NOV Fiber Glass Systems'Total <br /> Quality Installation Program for the installation of UL listed primary <br /> and secondary containment products. <br /> 7JRed Thread IIA 9J300043000LCX 1116 <br /> Primary and Secondary Containment Systems Date <br /> Renewal of the bonder training is recommended every three years <br /> or when the bonding process has not been practiced for a period of 6 months. <br />
The URL can be used to link to this page
Your browser does not support the video tag.