My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
6009
>
2300 - Underground Storage Tank Program
>
PR0542116
>
INSTALL_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2020 3:23:12 PM
Creation date
7/23/2020 1:45:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0542116
PE
2351
FACILITY_ID
FA0024188
FACILITY_NAME
GRIN INVESTMENTS INC DBA: ARCO AM/PM
STREET_NUMBER
6009
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95207
APN
08126064
CURRENT_STATUS
01
SITE_LOCATION
6009 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
653
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
It=# 207]1 <br /> I <br /> ComponentsAssembling Probe <br /> Attaching Probe Canister Insulator Sleeves (2-Inch Risers) <br /> 1. Open the Probe shipping carton so that you have access to the probe.Also open the installation kit. <br /> 2. Install the two canister sleeves onto the probe canister as shown in Figure 7. <br /> 1 i 2 ,j 3 <br /> 4 � <br /> 744-3.eps <br /> Figure 7. Installing Probe Canister Insulator Sleeves <br /> Attaching Probe Canister Spacer Rings (3- & 4-Inch Risers) ' <br /> 1. Open the Probe shipping carton so that you have access to the probe. Open the installation kit. <br /> 2. Set the spacer vanes for a 3-or 4-inch riser (see Figure 8) as required. Install the two spacer rings onto the <br /> probe canister as shown in the figure below. Note:you must slide the bottom spacer over the probe and onto <br /> the lower end of the canister. <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.