My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
6009
>
2300 - Underground Storage Tank Program
>
PR0542116
>
INSTALL_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2020 3:23:12 PM
Creation date
7/23/2020 1:45:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0542116
PE
2351
FACILITY_ID
FA0024188
FACILITY_NAME
GRIN INVESTMENTS INC DBA: ARCO AM/PM
STREET_NUMBER
6009
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95207
APN
08126064
CURRENT_STATUS
01
SITE_LOCATION
6009 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
653
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aaron Hang [EH] <br /> From: Ryan Bharucha <rbharucha@barghausen.com> <br /> Sent: Monday,April 9, 2018 2:42 PM <br /> To: Aaron Hang [EH] <br /> Cc: Gurpartap(Gary) Singh (garybizl@yahoo.com);Josh Harlan;Alexia Inigues;Jay Grubb <br /> Subject: RE: CA-ARCO Stockton (6009 EI Dorado St.)/ Response to comments/ BCE#17866 <br /> Attachments: 17866-CI-CERT-Town&Country-2018-04-02-NOV Certificaitons.pdf <br /> Aaron, <br /> I have attached the NOV Certifications for the Arco in Stockton. Latham's certification is on the second page in the <br /> center. Sorry for the delay in submitting these. <br /> As for the Hosemaster Cut sheets,those sheets seem to be left over after one of the scope changes and are not going to <br /> be installed and can be taken out of the Cut Sheet packet. <br /> Let me know if there are any further outstanding items that we need to address or if you require any further <br /> documentation. <br /> Thank you, <br /> Ryan Bharucha ) Project Coordinator <br /> Office:425-251-6222 1 Ext: 7369 <br /> Barghausen Consulting Engineers, Inc. <br /> 18215 72"d Avenue South, Kent WA 98032 <br /> www.barghausen.com <br /> From:Josh Harlan <br /> Sent: Monday,April 09, 2018 1:09 PM <br /> To: Ryan Bharucha <rbharucha@barghausen.com> <br /> Cc:Gurpartap(Gary) Singh (garybizl@yahoo.com) <garybizl@yahoo.com> <br /> Subject: FW: CA-ARCO Stockton (6009 EI Dorado St.)/ Response to comments/BCE#17866 <br /> Ryan, <br /> Please see below for request from San Joaquin County regarding NOV certification. <br /> Joshua A. Harlan, PE ( Project Engineer <br /> Office:425-251-6222 1 Direct:425-656-7428 <br /> Barghausen Consulting Engineers, Inc. <br /> 409 Pine Street Ste 300, Klamath Falls OR 97601 <br /> www.barghausen.com <br /> From:Gary Singh <garybizl@vahoo.com> <br /> Sent: Monday,April 09, 2018 1:07 PM <br /> To:Josh Harlan<jharlan@barghausen.com> <br /> Subject: Fwd:CA-ARCO Stockton (6009 EI Dorado St.)/Response to comments/BCE#17866 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.