My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
6009
>
2300 - Underground Storage Tank Program
>
PR0542116
>
INSTALL_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2020 3:23:12 PM
Creation date
7/23/2020 1:45:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0542116
PE
2351
FACILITY_ID
FA0024188
FACILITY_NAME
GRIN INVESTMENTS INC DBA: ARCO AM/PM
STREET_NUMBER
6009
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95207
APN
08126064
CURRENT_STATUS
01
SITE_LOCATION
6009 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
653
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fiber Glass Systems I Key compietlan& <br /> Woductionsohutloa" fiber Glass Systems I KOY tomptetion& <br /> ProductionSoruiSons '. <br /> IO a has successfully completed rn <br /> Bonder Training as s t forth in the NOV Fiber Glass Systems'Total Car S has successfully completed j <br /> Bonder Training as set fo h in the NOV Fiber Glass Systems'Total <br /> Quality installation Program for the installation of UL listed primary <br /> Quality Installation Program for the installation of UL listed primary <br /> and secondary containment products. <br /> and secondary containment products. <br /> WRed Thread IIA 3000L 6d300pLCX FU( <br /> Primary and Secondary Containment Systems Date Red Thread IIA 11(3000L�3000LCX <br /> Primary and Secondary Containment Systems Date <br /> Renewal of the bonder training is recommended every three years <br /> or when the bonding process has not been practiced for a period of 6 months. Renewal of the bonder training is recommended every three years <br /> or when the bonding process has not been practiced for a period of 6 months. <br /> Fiber Glass S fiber Glass Systems I KASY a od lira"srlrtior;u <br /> Systems I KOY Pr ducti un 9 <br /> .I Productio;�SolutEonrs �(.a.u.��j�YeS n/� <br /> Zu t ( �j �g has successfully completed <br /> has <br /> Bonder Training as set forth int NOV er Glass Systems'Total successfully completed Bonder Training as set forth in the NOV Fiber Glass Systems'Total <br /> Fib <br /> Quality Installation Program for the stty Installation Program for the insrallation of UL listed primary <br /> and secondary containment productsinstallation of UL listed primary and ec secondary containment roducs <br /> Red Thread UA p43p0pL�0Q0LCX @Red Thread IIA EL00L�3000LCX <br /> tet`e '— Primary and Secondary Containment Systems Date <br /> Primary and Secondary Containment Systems Da <br /> Renewal of the bonder training is recommended ever three Renewal of the bonder training is recommended every three years <br /> or when the bonding process has ny ree years or when the bonding process has not been practiced for a period of G months. <br /> not been practiced for a period of 6 months. <br /> Fiber Glass Systems I K19Y PmducfianSrt4r;.+cn. <br /> has successfully completed <br /> Boucle raining as se oE-th in the NOV Fiber Glass Systems'Total <br /> Quality Installation Program for the installation of UL listed primary <br /> and secondary containment products. <br /> RRed Thread IIA 93000L i3000LCX f !l_61tj <br /> Primary and Secondary Containment Systems Date <br /> Renewal of the bonder training is recommended every three years <br /> or when the bonding process has not been practiced for a period of 6 months. <br />
The URL can be used to link to this page
Your browser does not support the video tag.