Laserfiche WebLink
® www.opwglobal.com ITEM #41 <br /> Patent Pending <br /> e c <br /> o <br /> O <br /> mew, <br /> Valvee�i�� prevention <br /> 0� <br /> Are you Prepared <br /> for New EPA <br /> Overfill Valve Test <br /> Requirements? <br /> Spend 60 Seconds vs - <br /> 60 Minutes per Tank! <br /> Now you can be <br /> with the New OPW <br /> Testable 71 SO Overfill <br /> Prevention Valve <br /> The easiest, most affordable way <br /> to ensure overfill compliance <br /> New updated EPA 1988 UST regulations will require <br /> periodic system tests (every 1 to 3 years) <br /> UST systems (drop tube, overfill prevention valve, <br /> spill containers) must be tested for vapor tightness <br /> Overfill prevention valves shut off devices <br /> must be manually inspected <br /> 100 9393 Princeton-Glendale Road • Hamilton,Ohio USA 45011 • Phone:(800)422-2525 • Fax:(800)421-3297 02013 OPW Fueling Components <br />