Laserfiche WebLink
Aq��N Cammunity Development Denartment <br /> INSPEPfION RECORD MR PERMIT <br /> qCa op4tN <br /> BP-1702361 (ADDITION REMODEL) <br /> Request Inspections Online at hUg.-11www.s o�g/commdev <br /> Or call(209)468-3165 and leave the PERMIT NUMBER and the <br /> INSPECTION ITEM NUMBERS) ONLY. <br /> Inspection Requests received before 3:00 P.M.on a regular business day will be scheduled for the following <br /> working day. <br /> STREET ADDRESS MUST BE POSTED BEFORE THERE CAN BE ANYINSPECTIONS <br /> Carbon Monoxide Alarms and Smoke Detectors will be required in existing dwellings when <br /> a building permit is required for alterations, repairs, or additions exceeding $1,000. <br /> Permit No: BP-1702361 APIC• 143-126-10 Permit Issued Date: 07/07/2017 <br /> Job Site Address: 1648 N. MYRAN AV STOC <br /> Cross St: LEWIS <br /> Description: REPLACE WATER HEATER AND REPAIR OR REPLACE ELECTRICAL FIXTURES TO EXISTING SFR <br /> Owner. COMMUNITY PTP FOR REVITALIZATION <br /> Contractor: STEEL BLUE CORP Phone: 209-951-9451 <br /> OBTAIN BUILDING INSPECTION SIGNATURE PRIOR TO COVERING EACH PHASE OF WORK <br /> Item# Description Date/Inspector Strikes Item# Description Date/Inspector Strikes <br /> 125 Footings/Forms................ L)( )L) 705 Patio Foundation.............. LkK) <br /> 145 Pier Holes/Cassions............. L)( )L) 710 Patio Roofing................ 000 <br /> 155 Underfloor................... ()(_)L) 715 Patio Roof Nail............... 000 <br /> 160 Underfloor/Duct System.......... ()()C) 720 Patio Shearwall............... CX-)o <br /> 190 MasonBlockGrout/Ist Lift....... (x)(_) 735 Patio Final................... (x)(_) <br /> 191 Mason/BlockGrout/2nd Lift...... UC)U 996 Third Strike Inspection......... <br /> 192 MasonBlockGrout/3rd Lift....... ()(x) 997 Caller Unable to Specify....... <br /> 205 Roof Sheathing ................ )(Jo 999 Building Permit Final.......... (�(, <br /> 209 Shearwalls.................... CX-" <br /> 235 Building Rough............... (x)(_) <br /> 240 Frame/Ibpout/Elec/Duct/Gas Test.. 000 <br /> 243 Insulation-Underfloor.......... CXX) <br /> 245 Insulation-Walls.............. 000 <br /> 246 Insulation-Ceiling............. UUL) <br /> 250 Sheetrock Nail................. 000 <br /> 265 Firewall...................... (-)(_-)L) <br /> 270 Pre-Lath..................... 000 <br /> 273 Lath........................ vUU <br /> 285 Pre-Siding..................... UUU <br /> 295 Structure Final................. C_)(_)L) <br /> 305 Plumbing Underground.......... (AY-) <br /> 310 Plumbing Water Service.......... C)(,(_) <br /> 315 Plumbing/Sewer Line/Connect..... C)00 <br /> 320 Plumbing Rough................ 000 <br /> 325 Plumbing Topout .............. 000 <br /> 330 Plumbing Shower Pan/Hotmop Test ()(_)C) <br /> 340 Plumbing Gas Test............. 000 <br /> 345 Plumbing Gas Service........... (-XYJ <br /> 395 Plumbing Final................. (-XYJ <br /> 405 Mechanical Rough/Duct System... LX)U <br /> 495 Mechanical Final............... C.J) <br /> 515 Electrical Underground.......... 000 <br /> 520 Electrical Rough............... C)(_)(_) <br /> 525 Electrical Service............... 000 <br /> 595 Electrical Final................ (x)(_) <br />