Laserfiche WebLink
N <br /> .p <br /> Q <br /> FENCE <br /> d <br /> 8 <br /> PROD JC[ION WELL <br /> AND UMP <br /> 26.74 mw-5 <br /> ®.. 26.91 <br /> FERW <br /> 26.5 0 � <br /> 25.50 . ■® a� $°44i�'B <br /> 2(>.25 <br /> MAIN BUILDING <br /> LEGEND <br /> MW-1 - - MONITORING WELL LOCATION <br /> 27.14 /ELEVATION OF GROUND WATER (FEET MSL) <br /> 29.00 GROUND WATER ELEVATION CONTOUR (FEET MSL) <br /> MW-1 THROUGH MW-4 INSTALLED JULY 23 — 26, 1985 <br /> MW-5 THROUGH MW-7 INSTALLED AUGUST 25 — 27, 1986 <br /> MW—B INSTALLED AUGUST 25, 1987 <br /> --------- <br /> KL <br /> PROJECT NO. <br /> W <br />