My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012667
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WINEMASTERS
>
1
>
3500 - Local Oversight Program
>
PR0545907
>
ARCHIVED REPORTS_XR0012667
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2020 3:09:52 PM
Creation date
7/23/2020 2:58:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012667
RECORD_ID
PR0545907
PE
3528
FACILITY_ID
FA0005259
FACILITY_NAME
GUILD WINERY
STREET_NUMBER
1
STREET_NAME
WINEMASTERS
STREET_TYPE
WAY
City
LODI
Zip
95240
APN
04908033
CURRENT_STATUS
02
SITE_LOCATION
1 WINEMASTERS WAY
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
303
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> 1• H. KLEINFELDER&ASSOCIATES <br /> �a <br /> 4 PROJECT ORGANIZATION MW SC=IIi,F <br /> 4.1 PROJECT ORGANIZATION <br /> s" <br /> The key to efficiently conducting a cost effective remedial program is <br /> € ' proper planning. A well—planned program is vital for good management and <br /> practical application of resources. If the program is ill conceived and <br /> not well planned, the evaluation of remedial options, likewise, may be <br /> �- less than thorough. Thus, selection of a qualified project team which is <br /> 1.4 quite familiar with the type of problem at hand and appropriate remedial <br /> �.- measures is Most important. As such, we have selected a team that is <br /> knowledgeable of state—of--the art remedial techniques, experienced in <br /> application of remedial technologies, and capable of cost—effectively <br /> managing this project. <br /> Figure 4.1.1 illustrates the project team we have selected for the conduct <br /> ft of this remedial, program. Mr. Donald Rothenbaum will serve as Project <br /> Director and the corporate officer responsible for execution of the <br /> s = project. Mr. Rothenbaum has over ten years experience in all facets of <br /> -� environmental management and has been particularly active over the past <br /> seven years in hazardous waste management. He will be assisted by Mr. <br /> r- Kent Zenobia, P.E., who is a registered civil engineer in the State of <br /> California. Separately, Mr. Zenobia has over thirteen years of experience <br /> in civil and environmental engineering. He has also participated as <br /> !ai <br /> Project Manager on numerous environmental projects over the past seven <br /> years, including complex commercial TSA hazardous waste facilities. Mr. <br /> Zenobia will be responsible for the day—to—day coordination of project <br /> activities, including client liaison, technical coordination, financial <br /> management and scheduling. It is anticipated that Mr. Zenobia's chief <br /> contact -with---Guild Wineries _will .-be-Mr Doug Forquer, through whom all <br /> ----:. <br /> policy determination and scheduling matters will be transmitted. Direct <br /> 33-87-887 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.