Laserfiche WebLink
1. H. KLEINFELDER & ASSOCIATES <br /> rs' S PROJFCI COST <br /> 1 <br /> An itemization of the project costs are presented below: <br /> € ACTIVITY COST <br /> 3.1 Ground Water modeling 55,345 <br /> 3.2 Ground Nater mcaitcring $21!47 <br /> 3.3 Data Manager.ent $7,505 <br /> 3.4 Siting Early Warning/Detectfon Hell(s) $334 <br /> 3.5 Install Early Kerning/Cetectlen Nell(s) + $958 <br /> Develop Kell $679 <br /> f* 3.5 Remedial Alternative Screening SO <br /> 3.7 Remedial Alternative Eyaluaticn $6,271 <br /> g 3.E .Remedial Alternative Design $4,48s <br /> 3.9 Construction 5 Start-ov 5139 <br /> f., 3.10 Treatment System Effluent Disaositicn 15,192 <br /> 3.11 Trea:aent System Performance,assess.-ant $3,932 <br /> s 3.12 Pernitting& Regulatory Liaison $5,819 <br /> EXPENSES <br /> Travel mileage (4 round trips) as $195 <br /> Travel mileage (2 round trips) sos $160 <br /> Publications, Reproduction, and Graphics $250 <br /> Telephone $100 <br /> Express Deliveries $So <br /> miscellanecus $100 <br /> MATERIALS <br /> PVC casing and end caps $462 <br /> Sand--03 $63 <br /> a.: <br /> Bentonite pellets $375 <br /> Con.rete/grout $240 <br /> Security covers and looks $105 <br /> "6 Riscellareous materials $55 <br /> i Efod1PWENi <br /> ' Teflon bailer $25 <br /> Water level indicator 525. <br /> EC/pH/temp, instrument $30 <br /> Safety equipaent, limited level 0 $50 <br /> PID $125 <br /> Well develcpment tool $20 <br /> SUBC0l7TRACT SERVICES <br /> Drilling $1,500 <br /> Laboratory analysis= $8,420 <br /> Well elevation survey $465 <br /> w TOTAL -$S2,3D4 - - <br /> ' Includes 200%cost factor for 24-40 hour turnaround time. <br /> s includes mileage for project management activities only, <br /> mileage for sampling activities are incltdad in those tasks. <br /> s$s Includes mileage for well drilling and related activities. <br /> + Includes drilling,materials and development for one well only. <br /> �+ 33-87-887 30 <br />