My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_CASE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
707
>
2900 - Site Mitigation Program
>
PR0500097
>
WORK PLANS_CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2020 3:24:04 PM
Creation date
7/23/2020 3:17:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
CASE 1
RECORD_ID
PR0500097
PE
2950
FACILITY_ID
FA0001329
FACILITY_NAME
PONTES QUICKI KLEEN CAR WASH
STREET_NUMBER
707
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22323013
CURRENT_STATUS
01
SITE_LOCATION
707 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring Well Abandonrnent Workplan <br /> 707 East Yosemite Avenue,Manteca,California <br /> In July 1993, Aegis conducted a subsurface investigation that included drilling three soil <br /> borings to 15 feet below grade (bg) in the vicini y of the pump islands and UST basin <br /> (Figure 2). Soil sample analytical results indicated no petroleum hydrocarbons were <br /> detected, except 0.008 ppm of xylenes at 15 fee bg adjacent to the western dispenser <br /> island (SB-1). <br /> In August 1993, Aegis conducted a subsurface investigation that included three soil <br /> borings to 30 to 35 feet bg, which were completed as 2-inch diameter groundwater <br /> monitoring wells. Soil sample analytical results indicated no petroleum hydrocarbons <br /> were detected, except 0.005 ppm of xylenes at 20 feet bg in MW-3. <br /> In August 1993, Aegis personnel collected ground ater measurements and samples from <br /> the three monitoring wells. The sampling was observed by SJCEHD. Water sample <br /> analytical results indicated no petroleum hydrocarbons ' were present. Aegis <br /> "Groundwater Monitoring Well Installation Results Report", dated September 14, 1993, <br /> details the well installation and groundwater sampling. SJCEHD requested a confirmation <br /> sampling event to take place at least 30 days after the initial sampling date. In <br /> October 1993, the three wells were again sampled under the observation of SJCEHD. <br /> Analytical results indicated that no petroleum hydr carbons were present and site closure <br /> is warranted. <br /> PROPOSED WORK <br /> The following proposed scope of work will be conducted: <br /> • Abandon the three groundwater monitoring wells (Figure 2) by pressure grouting <br /> the wells with a neat cement/bentonite slurry. <br /> • Prepare closure report summarizing thea andonment. <br /> SITE HEALTH-AN.D-SAFETY-PLAN•. �� <br /> A site health and safety plan (SHSP) has been prepared and will be on site during all <br /> field activities. All on-site work will be conducted according to the SHSP, which contains <br /> information on the properties of hazardous materials known or suspected to be on site. <br /> i <br /> 93.042C.WPN 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.