Laserfiche WebLink
c <br /> wBuilding <br /> h <br /> rn <br /> Z <br /> 0 MW-3 <br /> Z SB-2 <br /> T- <br /> U) <br /> MW-2 <br /> i 10K Gasoline' <br /> Dispenser <br /> Islands 10K Gasolinel • <br /> ' - - - - - - SB-3 <br /> SB-1 :8K Diesel i <br /> -q`MW-1 Underground <br /> Storage Tanks <br /> i <br /> EAST YOSEMITE AVENUE <br /> LEGEND NOTES <br /> Site Sketch Drawn After Monitoring Well Locations Map <br /> Monitoring Well By Siegfried Engineering, Inc. } <br /> August 25, 1993 I <br /> • Soil Boring All Locations Are Approximate <br /> 0 30 60 <br /> Approximate Scale ; <br /> 1"=30' <br /> SITE MAP FIGURE <br /> DRAWN BY: DATE: : 2 . <br /> D. Hada September 5,1993 Pont s'Quicki-Kleen Car Wash <br /> REVISED 9Y: DATE: 707 East Yosemite PROJECT NOME-n <br /> REVIEWED BY: DATE: Manteca, CA 93_042 <br />