Laserfiche WebLink
T 29 September 1998 <br /> AGE-NC Project No: 98-0492 <br /> Page 4 of 7 _ <br /> G.O. ON-SITE WORK PLANS <br /> Work party(ies) consisting of two persons will perform the following tasks: <br /> PROJECT TEAM LEADER: TAS <br /> William Little - Pres rve soil samples; direct boring <br /> FIELD CREW: TAS <br /> Operator -Adva=e borings <br /> Field.Technician (if nec.) Clean equipment <br /> The works party(ies) were briefed on the content of this plan at the site on <br /> 7.0. COMMUNICATION PROCEDURES <br /> If hearing is impaired, the following standard hand sig1kals will be used: <br /> Hand gripping throat: ut of air; cannot breath . <br /> Grip partner's wrist or both hands around waist: - eave area:immediately <br /> Hands on top of head: Need assistance <br /> Thumbs up: K; Tarn alright; I understand <br /> Thumbs down: o;-negative <br /> 8.0. .EMERGENCY MEDICAL CARE <br /> San Joaquin General Hospital located at 500 Hospital (Manthey) Road, is approximately 10 <br /> :minutes from the site. A map depicting the route to this facility is attached. <br /> Local ambulance service is available at.phone 91 1.1heir response time is-an estimated IO minutes. <br /> :Advanced GeoEnvironmental,Inc. <br />