My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003620
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2072
>
2900 - Site Mitigation Program
>
PR0505553
>
ARCHIVED REPORTS_XR0003620
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2020 4:29:14 PM
Creation date
7/23/2020 3:55:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003620
RECORD_ID
PR0505553
PE
2960
FACILITY_ID
FA0006856
FACILITY_NAME
FRANKS FOOD MART
STREET_NUMBER
2072
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
94336
APN
22202001
CURRENT_STATUS
01
SITE_LOCATION
2072 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ethylbenzene, and Wenes (collectively known as BTEX), the five fuel <br /> oxygenates, and lead scavengers by EPA Method 8260B A copy of the <br /> analytical report is attached in Appendix A <br /> The analytical results indicated concentrations of "MTBE only" in parts p e t <br /> billion (ppb) as follows <br /> Sample Id. Result (in P ))h1 <br /> 17950-INF-02-27-02 1 7 0 <br /> 17950-AS-02-27-02 1 10 <br /> 17950-GAC 1 -02-27-02 20 <br /> 17950-GAC2-02-27-02 < 05 <br /> No other compounds were identified to any of the water samples At no <br /> time did water containing MTBE enter the plumbing system of the <br /> residences on the property <br /> The current effictenc} of the air-stripper to remove MTBE is below the <br /> projected efficiency derived during the air-Stripper modeling phase of this <br /> project ASE was expecting an efficiency in the 50% to 60% range for <br /> MTBE removal at these concentrations ASE will make an adju�,tment to <br /> the air flow and exhaust plumbing, as recommended by the air-stripper <br /> manutacturei, to assist in the MTBE removal efficiency <br /> The two GAC canisters are scheduled foi carbon replacement dozing the <br /> week of Mai ch 25, 2002 <br /> QUARTERLY OPERATION AND MAINTENANCE, SAMPIING AND <br /> REPORTING <br /> ASE is currently under contract to perform quarterly operation and <br /> maintenance (O&M) activities and collect samples and prepare a i epos t <br /> every 3 months to determine the effectiveness of the treatment �,vstem <br /> ASE will continue to %isit the Site periodically to check the perfoi mance o t <br /> the system, backflush the carbon canisters, if necessary, and iepair any <br /> problems that arise <br /> ASE will continue to collect influent (pie-treatment), after ati -stripping <br /> and atter carbon canister (post-treatment) water samples eery three <br /> months for analysis of TPH-G, BTEX, the five fuel oxygenates and lead <br /> •, scavengers by EPA Method 8260B ASE will prepare and issue a t epos t in <br /> the following month that details the quaff tea's activities Should it b e <br /> determined that hydrocarbons ate breaking-through the first carbon <br /> - 2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.