Laserfiche WebLink
. REMOVAL OF ALTERNATIVE WATER STIPPI,Y <br /> The Aeropure Watei alternative water supply was disconnected fiom the <br /> plumbing System after the system's performance was evaluated and found <br /> to be operating as designed <br /> QUARTERLY OPERATION AND _. . MAINTENANCE, SAMPLING AND <br /> REPORTING <br /> ASE is currently under contract to perform quarterly operation and <br /> maintenance (O&M) activities and collect samples and prepare a report <br /> every 3 months to determine the effectiveness of the treatment system <br /> ASE will visit the site periodically to check the performance of the system, <br /> backflush the carbon canisters, if necessary, and repair any problems that <br /> arise <br /> ASE will also collect influent (pre-treatment), and after carbon canister <br /> (post-treatment) water samples every three months for analysis of TPH-G, <br /> BTEX, the five fuel oxygenates, and lead scavengers by EPA Method 8260B <br /> ASE will prepare and issue a report in the following month that details the <br /> quarter's activities Should it be determined that hydrocarbons are <br /> breaking-through the fiist carbon canister, ASE will replace that canister <br /> with a new one <br /> A copy of the quarterly ieport will go to the property owner, tenants o u r <br /> client, and the appropriate regulatory agencies <br /> -3 - <br />