Laserfiche WebLink
REMOVAL OF ALTERNATIVE. WATER SUPPLY <br /> The Aeropure Water alternative water supply was disconnected from the <br /> plumbing system after the system's performance was evaluated and found <br /> to be operating as designed <br /> QUARTERLY OPERA110N AND MAINTENANCE, SAMPLING AND <br /> REPORTING <br /> ASE is currently under contract to perform quarterly operation and <br /> maintenance (O&M) activities and collect samples and prepare a repos t <br /> every 3 months to determine the effectiveness of the treatment system <br /> ASE will visit the site periodically to check the performance of the system, <br /> backflush the carbon canisters, if necessary, and repair any problems that <br /> arise <br /> ASE will also collect influent (pre-treatment), and after carbon canister <br /> (post-treatment) water samples every three months for analysis of TPH-G, <br /> BTEX, the five fuel oxygenates, and lead scavengers by EPA Method 8260B <br /> ASE will prepare and issue a report in the following month that details the <br /> • quarter's activities Should it be determined that hydrocarbons are <br /> breaking-through the fitst carbon canister, ASE will replace that canister <br /> with a new one <br /> A copy of the quarterly report will go to the property owner, tenants, o u t <br /> client, and the appropriate regulatory agencies <br /> Should you have any questions or comments, please feel free to give us a <br /> call at (925) 820-9391 <br /> Respectfully submitted, <br /> A SCIENCE ENGINEERS INC <br /> David Allen <br /> Senior Project Manager <br /> Cc Ms Kaon Meyer <br /> Propel ty Tenants <br /> Mr Frank Gurnta, Pi operty Owner <br /> • Mr Don Thompson <br /> Ms Lori Duncan, San Joaquin County PHS-EHD <br /> Mr Marty Hartzell, RWQCB <br /> Mr Mark Owens, UST Cleanup Fund <br />