Laserfiche WebLink
I <br /> system compliance and points of breakthrough Sampling intervals and <br /> analyses will be determined by the City of Manteca Public Works <br /> Department in conjunction with the San Joaquin County PHS-EHD <br /> 6 1 5 Sanitary Sewer Plumbing <br /> Water exiting the carbon vessels will then be piped to a buried 4-inch <br /> I diameter sewer pipe which will be plumbed into the city sewer manhole at <br /> the northwest corner of the subject site <br /> r61 6 Security <br /> As depicted on Figure 5, all of the groundwater extraction and treatment <br /> system will be located on-site within a 6-foot high cyclone fence <br /> 7 . 0 SCHEDULE <br /> ASE will begin field work at this site immediately upon approval of this <br /> workplan by the San Joaquin County PHS-EHD Drilling for the installation <br /> of the extraction wells is scheduled for the week of September 11, 2000 <br /> The installation of the system is scheduled for the following week <br /> Should you have any questions or comments, please call us at (925) 820- <br /> 9391 <br /> Respectfully submitted, <br /> AQ SCIENCE ENGINEERS, INC <br /> I � <br /> David Allen <br /> Senior Project Manager pF <br /> a <br /> } <br /> OF CAS <br /> I Robert E Kitay, R G , R E A <br /> Senior Geologist <br /> Frank's One Stop Interim Remediation System Workplan — September 2000 <br /> I -16- <br />