Laserfiche WebLink
0 • <br /> date of this workplan), then TPH-D will also be added to the <br /> analytical suite Labor atoi y turnai ound time will be based on the <br /> particular impoitance of each individual sample in determining <br /> additional Scope of work such as in determination as to whether an <br /> additional boring is necessary or whethei deepei drilling is <br /> necessaiy <br /> 7) In at least one boring, ASE will collect a soil sample from each <br /> significantly different unit and will submit these samples to a <br /> geotechnical laboiatoty for analysis for permeability, porosity, bulk <br /> density, moistuie content and organic caibon content <br /> 3 .4 SSE DON IV— PRESENT THE DATA FROM SECTION III IN A REPORT <br /> ASE will prepare a teport piesenting results of this assessment This <br /> tepoit will be Subinitted under seal of a California registeied geologist <br /> This report will include the following <br /> 1) This repoi t will include maps showing boi ing locations for all <br /> • borings and monitoring wells drilled to date as well as other relevant <br /> features such as UST and domestic well locations Maps included in <br /> the report will also show hydrocarbon isoconcentiation contours, <br /> groundwater flow rose diagrams, and geologic cross-section <br /> locations <br /> 2) Geologic cross-sections will be prepared across each transect as well <br /> as across the downgradient axis These geologic cross-sections will <br /> include significant features such as boring locations, monitoring, <br /> domestic and irrigation well locations and construction, UST <br /> locations, and the distribution of contamination in ci oss-sectional <br /> form <br /> 3) Localized flownets will also be considered if deemed relevant after <br /> available data is collected <br /> 4) Analytical and geotechnical results will be presented in tabular <br /> form <br /> S) Mass flux estimates across each plume transect line will b e <br /> calculated <br /> Frank's One Stop Workplan — September 2000 <br /> -10- <br />