Laserfiche WebLink
. Foi complete details t edai ding the opet ation of the system since it', <br /> startup, see the ASE January 2002 Monthly Operation and Maintenance <br /> (O & M) report <br /> 6 . o MONTHLY REPORTING AND MAINTENANCE <br /> On a monthly ba51s, ASE will pi epare a repot t that will detail t h e <br /> i enlediation System , perfoi mance dui ina the past rnonth The i epos t will <br /> include the information gathered by ASE during its every-other-day visats <br /> to the site (volume of air ti Bated volume of all infected, vacuum at each <br /> well, engine rpm, influent air concentrations, and notes regarding system <br /> operation and maintenance performed) The log sheet used by ASE will b e <br /> included in each report as well as the tabulated analytical data of t h e <br /> influent air samples <br /> Should you have any questions or comments, please feel flee to call us at <br /> (925) 820-9391 <br /> Respectfully submitted, <br /> AQUA SCIENCE ENGINEERS, INC <br /> 1D <br /> David Allen <br /> Senior Project Manager <br /> � = Mia,BSss <br /> OF CA1-�F� <br /> Robert E Kztay, R G , R E A <br /> Senior Geologist <br /> Cc Mr Frank Guinta <br /> Mr Don Thompson <br /> Ms Lori Duncan, San Joaquin PHS-EHD <br /> . Mr Marty Hartzell, RWQCB <br /> Mr Mark Owens, USTCF <br /> Frank's One Stop ASNE Remediation System Installation Report — February 2002 <br /> -7- <br />