214 Airport Way property Boring CPT-20 was located on the east <br /> shoulder of Airport Way in front of 282 Airport Way Boring CPT-21 was <br /> located at 2043 West Yosemite Avenue near the domestic well located on <br /> that property Borings CPT-23 and CPT-24 were located near the northern <br /> and western property lines of 17717 Airport Way Borings CPT-22 a n d <br /> CPT-25 were located on the 17793 Airport Way property Please note that <br /> CPT-25 was originally planned to be drilled on the 17821 Airport Way <br /> property However, due to access problems, this boring was moved onto <br /> the 17793 Airport Way property This borings was, however, drilled only <br /> 45-feet from the domestic well on the 17821 Airport Way property <br /> Boring CPT-26 was located on the vacant lot on the northeast corner of <br /> the Airport Way and West Yosemite Avenue intersection <br /> A report explaining the CPT procedures and presenting the CPT logs and <br /> test results is presented in Appendix C <br /> 4-3 Soil Sample Collection <br /> During the drilling of soil boring CPT-26, undisturbed soil samples were <br /> collected in several different hydrogeologic units for lithologic and <br /> hydrogeologic description using the Unified Soil Classification System A <br /> . description of these soil samples and a comparison of the geologist's <br /> descriptions to the CPT classification are located in Appendix D The <br /> original scope of work called for the collection of an undisturbed soil <br /> sample from each significantly different unit from one boring, originally <br /> planned for CPT-26 These samples were to be analyzed by a geotechnical <br /> laboratory for permeability, porosity, bulk density, moisture content a n d <br /> organic carbon However, the geotechnical laboratories contacted by ASE <br /> required a 2-inch diameter undisturbed soil sample to complete these <br /> analyses, and 2-inch diameter samples could not be collected with the <br /> CPT drill rig For this reason, this portion of the proposed scope of work <br /> was not completed <br /> 4-4 Water Sample Collection <br /> Following the collection of the lithologic information with the initial CPT <br /> boring as described in section 4 2, a second boring was drilled adjacent <br /> to the initial CPT boring for the collection of groundwater samples <br /> Groundwater samples were collected from areas of suspected high <br /> permeability in this second boring At each sampling interval, a <br /> Hydropunch was pushed to the desired sample depth A water level <br /> • meter was then dropped through the rods to verify that there was no <br /> leakage through the rods prior to opening the tip of Hydropunch screen <br /> Franks One Stop Report — March 2001 <br /> -ll - <br />