Laserfiche WebLink
, w..3.un 25 01 02: 14p MCR Eneineering (209) 239-8839 P. 2 <br /> PROPOSAL <br /> ENGINEERING SERVICES <br /> Airport Way Water main <br /> Manteca,California <br /> For <br /> Aqua Science <br /> June 29,2001 <br /> 1. 70POGRAPHIC SURVEY <br /> A. Perforin topographic survey of Airport Way along water main route. <br /> B. Show all surface and subsurface features obtainable from our field topographic survey. <br /> C. Prepare base map for use in design of water main location. <br /> Lump Sum-$2,600.00 1 <br /> 2. IMPROVEMENT PLANS <br /> A. Prepare Improvement Plans for water main: <br /> ,y 1. Plan and Profile Drawings <br /> ( ' 2. Specifications <br /> 3. Construction Details <br /> 4. Cover sheet and Vicinity map <br /> B. Stub water services to properties located along proposed alignment. <br /> C. Process plans for approval through the following agencies: <br /> 1. San Joaquin County <br /> 2. City of Manteca <br /> 3. South San Joaquin Irrigation District <br /> D. Provide engineers opinion of probable construction costs. <br /> Lump Sum-$ 13,600.00 <br /> 3. CONSTRUCTION STAKING <br /> k <br /> A. Provide one set of stakes for line at 50'intervals for the water main. <br /> B. Stake location of each water service. <br /> Lump Sum-$2,600.00 <br /> I <br /> N_�,p„pny{y,7pQSAL16513 <br />