My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2450
>
2900 - Site Mitigation Program
>
PR0506303
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2020 4:44:01 PM
Creation date
7/23/2020 4:31:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506303
PE
2965
FACILITY_ID
FA0001086
FACILITY_NAME
MANTECA PUBLIC WORKS
STREET_NUMBER
2450
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
24130050
CURRENT_STATUS
01
SITE_LOCATION
2450 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 • • <br /> 1 Procedure No. Revision Number <br /> ERD SOP-2.10 3 Page 2 of 4 <br /> ' <br /> 3.2' Lamarre,A. L. (1989), Sampling and Analysis Plan for Coliform Bacteria in Water From <br /> Selected Site 300 Monitor Wells, Memo, Lawrence Livermore National Laboratory, <br /> Livermore, Calif. <br /> ' 3.3 State of California Department of Water Resources Agency (1981),Appendix C,Manual, <br /> "Water Well Standards: State of California,"Sacramento,Calif. <br /> 1 4.0 DEFINITIONS <br /> See SOP Glossary. <br /> 5.0 RESPONSIBILITIES <br /> 5.1 Division Leader <br /> 1 The Division Leader's responsibility is to ensure that all activities performed by ERD at <br /> the Livermore Site and Site 300 are performed safely, comply with all pertinent <br /> regulations and procedures, and provide the necessary equipment and resources to <br /> 1 accomplish the tasks described in this procedure. <br /> 5.2 Field Personnel <br /> 1 The field personnel are responsible for performing all field activities in a safe and <br /> efficient manner according to guidelines established herein, as well as associated SOPS. <br /> 1 5.3 Field Support Personnel <br /> The field support personnel are responsible for providing necessary equipment, collection <br /> 1 devices and general field support which enables personnel to perform field activities in a <br /> timely and efficient manner. <br /> 5.4 Sampling Coordinator (SC) <br /> 1 The SC's responsibility is to supply a quarterly Ground Water Sampling Plan, which <br /> includes the wells to be sampled for coliform bacteria. A spread sheet indicating the <br /> 1 amount of disinfectant to apply to each well prior to sampling for coliform bacteria is <br /> also provided by the SC. <br /> 1 6.0 PROCEDURES <br /> At the direction of the SC, the designated wells are disinfected in preparation for coliform <br /> bacteria sampling. The wells are disinfected to remove any bacteria within the well casing. <br /> 1 Each well will receive a dose of chlorine solution containing at least 100 mg/L of available <br /> chlorine. A calculation will be made to determine the appropriate amount of chlorine to add <br /> based upon the amount of water standing in the well casing. <br /> 6.1 Preparation <br /> 6.1.1 Perform preparation activities per SOP 4.1, "General Instructions for Field <br /> Personnel." <br /> 1 : <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.