My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_DRAFT ENVIRONMENTAL IMPACT REPORT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2450
>
2900 - Site Mitigation Program
>
PR0506303
>
ARCHIVED REPORTS_DRAFT ENVIRONMENTAL IMPACT REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2020 5:02:58 PM
Creation date
7/23/2020 4:33:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
DRAFT ENVIRONMENTAL IMPACT REPORT
RECORD_ID
PR0506303
PE
2965
FACILITY_ID
FA0001086
FACILITY_NAME
MANTECA PUBLIC WORKS
STREET_NUMBER
2450
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
24130050
CURRENT_STATUS
01
SITE_LOCATION
2450 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
736
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page: 2 Page: 3 <br /> 04/20/2007 6:02 PM 04/20/2007 6:02 PM <br /> URBEMIS 2002 For Windows 8.7.0 Phase 2 - Site Grading Assumptions: Phase Turned OFF <br /> File Name: C:\Documents and Settings\Kurtzj\My Documents\Active\SAC\Manteca\Manteca AQ\Urbemis\Manteca Long <br /> Project Name: Manteca Long Install Yr 1 Phase 3 -Building Construction Assumptions <br /> Project Location: San Joaquin Valley StartMonth/Year for Phase 3: Jun '08 <br /> On-Road Motor Vehicle Emissions Based on EMFAC2002 version 2.2 Phase 3 Duration: 12 months <br /> Start Month/Year for Sub Phase Building: Jun '08 <br /> DETAIL REPORT Sub Phase Building Duration: 12 months <br /> (Tons/Year) 0£f-Road Equipment <br /> No. Type Horsepower Load Factor Hours/Day <br /> Construction Start Month and Year: June, 2008 2 Other Equipment 190 0.620 9.0 <br /> Construction Duration: 12 2 Rubber Tired Loaders 165 0.965 5.0 <br /> Total Land Use Area to be Developed: 36 a Start Month/Year for Sub Ph ase Architectural Coatings: Apr '09 <br /> Maximum Acreage Disturbed Per Day: 0.2 a Sub Phase Axchifee oral Coatings Duration: 1.2 months <br /> Single Family Units: 0 Multi-Family UnitsYe0 Sub Phase Asphalt Turned OFF <br /> Retail/Office/Institutional/Industrial Square Footage: 5000 <br /> CONSTRUCTION EMISSION ESTIMATES UNMITIGATED (tons/year) <br /> p 1 PM10 2 1 <br /> Source ROG NOx CO SO2 TOTAL EXHAUST DUST <br /> *** 2008*** <br /> Phase 1 - Demolition Emissions <br /> Fugitive Dust - - - - 0.00 - 0.00 <br /> Off-Road Diesel 0.00 0.00 0.00 - 0.00 0.00 0.00 <br /> On-Road Diesel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Total tons/year 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Phase 2 - Site Grading Emissions <br /> Fugitive Dust - - - - 0.00 - 0.00 <br /> Off-Road Diesel 0.00 0.00 0.00 - 0.00 0.00 0.00 <br /> On-Road Diesel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Total tons/year 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Phase 3 -Building Construction <br /> Bldg Const Off-Road Diesel 0.29 1.92 2.33 - 0.07 0.07 0.00 <br /> Bldg Const Worker Trips 0.00 0.00 0.05 0.00 0.00 0.00 0.00 <br /> Arch Coatings Of f_ <br /> 0.00 - - - - - - <br /> Arch Coatings Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Asphalt Of 0.00 - - - - - - <br /> Asphalt Off-Road Diesel 0.00 0.00 0.00 - 0.00 0.00 0.00 <br /> Asphalt On-Road Diesel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Asphalt Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Total tons/year 0.29 1.92 2.38 0.00 0.07 0.07 0.00 <br /> Total all phases tons/yr 0.29 1.92 2.38 0.00 0.07 0.07 0.00 <br /> *** 2009*** <br /> Phase 1 - Demolition Emissions <br /> Fugitive Dust - - - - 0.00 - 0.00 <br /> Off-Road Diesel 0.00 0.00 0.00 - 0.00 0.00 0.00 <br /> On-Road Diesel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Total tons/year 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Phase 2 - Site Grading Emissions <br /> Fugitive Dust - - - - 0.00 - 0.00 <br /> Off-Road Diesel 0.00 0.00 0.00 - 0.00 0.00 0.00 <br /> On-Road Diesel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Total tons/year 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Phase 3 -Building Construction <br /> Bldg Const Off-Road Diesel 0.21 1.32 1.70 - 0.05 0.05 0.00 <br /> Bldg on <br /> Worker Trips 0.00 0.00 0.09 0.00 0.00 0.00 0.00 <br /> Arch Coatings Off-Gas 0.09 - - - - - - <br /> Arch Coatings Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Asphalt Off-Gas 0.00 - - - - - - <br /> Asphalt Off-Road Diesel 0.00 0.00 0.00 - 0.00 0.00 0.00 <br /> Asphalt On-Road Diesel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Asphalt Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Total to 0.30 1.32 1.74 0.00 0.05 0.05 0.00 <br /> Total all phases tons/yr 0.30 1.32 1.74 0.00 0.05 0.05 0.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.