My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_DRAFT ENVIRONMENTAL IMPACT REPORT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2450
>
2900 - Site Mitigation Program
>
PR0506303
>
ARCHIVED REPORTS_DRAFT ENVIRONMENTAL IMPACT REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2020 5:02:58 PM
Creation date
7/23/2020 4:33:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
DRAFT ENVIRONMENTAL IMPACT REPORT
RECORD_ID
PR0506303
PE
2965
FACILITY_ID
FA0001086
FACILITY_NAME
MANTECA PUBLIC WORKS
STREET_NUMBER
2450
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
24130050
CURRENT_STATUS
01
SITE_LOCATION
2450 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
736
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page: 2 Page: 3 <br /> 04/20/2007 6:00 PM 04/20/2007 6:00 PM <br /> URBEMIS 2002 For Windows 8.7.0 Phase 3 -Building Construction Assumptions: Phase Turned OFF <br /> File Name: C:\Documents and Settings\Kurtzj\My Documents\Active\SAC\Manteca\Manteca AQ\Urbemis\Manteca Long Phase 2 - Site Grading Assumptions <br /> Project Name: Manteca Long Grading Yr 2 Start Month/Year for Phase 2: Jun '09 <br /> Project Location: San Joaquin Valley Phase 2 Duration: 12 months <br /> On-Road Motor Vehicle Emissions Based on EMFAC2002 version 2.2 On-Road Truck Travel (VMT): 136 <br /> Off-Road Equipment <br /> DETAIL REPORT No. Type Horsepower LoadFactor Hours/Day <br /> (Tons/Year) 2 Other Equipment 190 0.620 20 <br /> 2 Rubber Tired Loaders 165 0.465 3..0 <br /> Construction Start Month and Year: June, 2009 2 Signal Boards 119 0.820 8.0 <br /> Construction Duration: 12 2 Tractor/Loaders/Backhoes 79 0.465 3.0 <br /> Total Land Use Area to be Developed: 31 acres <br /> Maximum Acreage Disturbed Per Day: 0.2 a <br /> Single Family Units: 0 MeU, <br /> Units: <br /> Retail/Office/Institutional/Industrial Square Footage: 5000 <br /> CONSTRUCTION EMISSION ESTIMATES UNMITIGATED (tons/year) <br /> P1 PM10 21 <br /> Source ROG NOx CO S02 TOTAL EXHAUST DUST <br /> *** 2009*** <br /> Phase 1 - Demolition Emissions <br /> Fugitive Dust - - - - 0.00 - 0.00 <br /> Off-Road Diesel 0.00 0.00 0.00 - 0.00 0.00 0.00 <br /> On-Road Diesel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Total tons/year 0.00 0.00 0.00 0.00 0.00 O.Oo 0.00 <br /> Phase 2 - Site Grading Emissions <br /> Fugitive Dust - - - - 0.15 - 0.15 <br /> Off-Road Diesel 0.46 3.08 3.70 - 0.12 0.12 0.00 <br /> On-Road Diesel 0.01 0.20 0.04 0.00 0.01 0.00 0.00 <br /> Worker Trips 0.01 0.01 0.24 0.00 0.00 0.00 0.00 <br /> Total tons/year 0.48 3.29 3.98 0.00 0.27 0.12 0.15 <br /> Phase 3 -Building Construction <br /> Bldg Const Off-Road Diesel 0.00 0.00 0.00 - 0.00 0.00 0.00 <br /> Bldg Const Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Arch Coatings Off-Gas 0.00 - - - - - - <br /> Arch Coatings Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Asphalt Of 0.00 - - - - - - <br /> Asphalt Off-Road Diesel 0.00 0.00 0.00 - 0.00 0.00 0.00 <br /> Asphalt On-Road Diesel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Asphalt Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Total tons/year 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Total all phases tons/yr 0.48 3.29 3.98 0.00 0.27 0.12 0.15 <br /> *** 2010*** <br /> Phase 1 - Demolition Emissions <br /> Fugitive Dust - - - - 0.00 - 0.00 <br /> Off-Road Diesel 0.00 0.00 0.00 - 0.00 0.00 0.00 <br /> On-Road Diesel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Total tons/year 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Phase 2 - Site Grading Emissions <br /> Fugitive Dust - - - - 0.11 - 0.11 <br /> Off-Road Diesel 0.33 2.10 2.72 - 0.08 0.08 0.00 <br /> On-Road Diesel 0.01 0.13 0.03 0.00 0.00 0.00 000 <br /> Worker Trips 0.01 0.01 0.17 0.00 0.00 0.00 0..00 <br /> Total tons/year 0.35 2.24 2.92 0.00 0.19 0.08 0.11 <br /> Phase 3 -Building Construction <br /> Bldg Const Off-Road Diesel 0.00 0.00 0.00 - 0.00 0.00 0.00 <br /> Bldg Const Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Arch Coatings Off-Gas 0.00 - - - - - - <br /> Arch Coatings Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Asphalt Off-Gas 0.00 - - - - - - <br /> Asphalt Off-Road Diesel 0.00 0.00 0.00 - 0.00 0.00 0.00 <br /> Asphalt On-Road Diesel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Asphalt Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Total to 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Total all phases tons/yr 0.35 2.24 2.92 0.00 0.19 0.08 0.11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.