Laserfiche WebLink
Page: 2 Page: 3 <br /> 04/20/2007 6:07 PM 04/20/2007 6:07 PM <br /> URBEMIS 2002 For Windows 8.7.0 Phase 2 - Site Grading Assumptions: Phase Turned OFF <br /> File Name: C:\Documents and Settings\Kurtzj\My Documents\Active\SAC\Manteca\Manteca AQ\Urbemis\Manteca Long <br /> Project Name: Manteca Long Pave Yr 2 Phase 3 -Building Construction Assumptions <br /> Project Location: San Joaquin Valley StartMonth/Year for Phase 3: Jun '09 <br /> On-Road Motor Vehicle Emissions Based on EMFAC2002 version 2.2 Phase 3 Duration: 12 months <br /> Sub PhaseBuilding Turned OFF <br /> DETAIL REPORT Sub Phase Architectural Coatings Turned OFF <br /> (Tons/Year) Start Month/Year for Sub Phase Asphalt: Jun '09 <br /> Sub Pus se Asphalt Duration: 12 months <br /> Construction Start Month and Year: June, 2009 Acres to be Paved: 31 <br /> Construction Duration: 12 0£f-Road Equipment <br /> Total Land Use Area to be Developed: 36 acres No. Type Horsepower Load Factor Hours/Day <br /> Maximum Acreage Disturbed Per Day: 0.2 a 2 Pavers 132 0.590 1.5 <br /> Single Family Units: 0 Multi-Family UnitsYe0 2 Rollers 114 0.430 1.5 <br /> Retail/Office/Institutional/Industrial Square Footage: 5000 <br /> CONSTRUCTION EMISSION ESTIMATES UNMITIGATED (tons/year) <br /> p 1 PM10 2 1 <br /> Source ROG NOx CO S02 TOTAL EXHAUST DUST <br /> *** 2009*** <br /> Phase 1 - Demolition Emissions <br /> Fugitive Dust - - - - 0.00 - 0.00 <br /> Off-Road Diesel 0.00 0.00 0.00 - 0.00 0.00 0.00 <br /> On-Road Diesel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Total tons/year 0.00 0.00 0.00 0.00 0.00 mo 0.00 <br /> Phase 2 - Site Grading Emissions <br /> Fugitive Dust - - - - 0.00 - 0.00 <br /> Off-Road Diesel 0.00 0.00 0.00 - 0.00 0.00 0.00 <br /> On-Road Diesel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Total tons/year 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Phase 3 -Building Construction <br /> Bldg Const Off-Road Diesel 0.00 0.00 0.00 - 0.00 0.00 0.00 <br /> Bldg Const Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Arch Coatings Off-Gas 0.00 - - - - - - <br /> Arch Coatings Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Asphalt Off-Gas 0.02 - - - - - - <br /> Asphalt Off-Road Diesel 0.06 0.37 0.55 - 0.01 0.01 0.00 <br /> Asphalt On-Road Diesel 0.00 0.07 0.01 0.00 0.00 0.00 0.00 <br /> Asphalt Worker Trips 0.01 0.01 0.12 0.00 0.00 0.00 0.00 <br /> Total tons/year 0.09 0.45 0.68 0.00 0.01 0.01 0.00 <br /> Total all phases tons/yr 0.09 0.45 0.68 0.00 0.01 0.01 0.00 <br /> *** 2010*** <br /> Phase 1 - Demolition Emissions <br /> Fugitive Dust - - - - 0.00 - 0.00 <br /> Off-Road Diesel 0.00 0.00 0.00 - 0.00 0.00 0.00 <br /> On-Road Diesel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> 0 <br /> Worker Trips 0.00 0.00 0.00 0.00 0.00 .00 0.00 <br /> Total tons/year 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Phase 2 - Site Grading Emissions <br /> Fugitive Dust - - - - 0.00 - 0.00 <br /> Off-Road Diesel 0.00 0.00 0.00 - 0.00 0.00 0.00 <br /> On-Road Diesel 0.00 0.00 0.00 0.00 0.00 0.00 000 <br /> Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0..00 <br /> Total tons/year 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Phase 3 -Building Construction <br /> Bldg Const Off-Road Diesel 0.00 0.00 0.00 - 0.00 0.00 0.00 <br /> Bldg Const Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Arch Coatings Off-Gas 0.00 - - - - - - <br /> Arch Coatings Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Asphalt Off-Gas 0.02 - - - - - - <br /> Asphalt Off-Road Diesel 0.05 0.21 0.39 - 0.01 0.01 0.00 <br /> Asphalt On-Road Diesel 0.00 0.04 0.01 0.00 0.00 0.00 0.00 <br /> Asphalt Worker Trips 0.00 0.00 0.09 0.00 0.00 0.00 0.00 <br /> Total to 0.07 0.31 0.49 0.00 0.01 0.01 0.00 <br /> Total all phases tons/yr 0.07 0.31 0.49 0.00 0.01 0.01 0.00 <br />