Laserfiche WebLink
Page: 3 Page: 1 <br /> 04/20/2007 6:09 PM 04/20/2007 6:10 PM <br /> Phase 3 -Building Construction Assumptions: Phase Turned OFF URBEMIS 2002 For Windows 8.7.0 <br /> Phase2 - Site Grading Assumptions File Name: C:\Documents and Settings\Rurtzj\My Documents\Active\SAC\Manteca\Manteca AQ\Urbemis\Manteca Out- <br /> Start Month/Year for Phase 2: Jun '08 Project Name: Manteca Outfall Central Install <br /> Phase 2 Duration: 9 months Project Location: San Joaquin Valley <br /> On-Road Truck Travel (VMT): 90 On-Road Motor Vehicle Emissions Based on EMFAC2002 ve rsxon 2.2 <br /> O££-Road Equipment <br /> No. Type Horsepower Load Factor Hours/Day SUMMARY REPORT <br /> 1 Other Equipment 190 0.620 8.0 (Tons/Year) <br /> 1 Rubber Tired Loaders 165 0.965 3.0 <br /> 1 Tractor/Loaders/Backhoes 79 0.465 3.0 CONSTRUCTION EMISSION ESTIMATES <br /> PM10 PM10 PM10 <br /> *** 2008 *** ROG NOx CO S02 TOTAL EXHAUST DUST <br /> TOTALS (tpy, unmitigated) 0.19 0.96 1.22 0.00 0.04 0.09 0.00 <br /> TOTALS (tpy, mitigated) 0.14 0.96 1.22 0.00 0.04 0.09 0.00 <br /> PM10 EM10 PM10 <br /> *** 2009 *** ROG NOx CO S02 TOTAL EXHAUST DUST <br /> TOTALS (tpy, unmitigated) 0.13 0.26 0.36 0.00 0.01 0.01 0.00 <br /> TOTALS (tpy, mitigated) 0.13 0.26 0.36 0.00 0.01 0.01 0.00 <br />