Laserfiche WebLink
Page: 3 Page: 1 <br /> 09/20/2007 6:16 PM 09/20/2007 9:90 PM <br /> Phase 2 - Site Grading Assumptions: Phase Turned OFF URBEMIS 2002 For Windows 8.7.0 <br /> File Name: C:\Documents and Settings\Rurtzj\My Documents\Active\SAC\Manteca\Manteca AQ\Urbemis\Manteca Oper <br /> Phase3 -Building Construction Assumptions Project Name: Manteca operations <br /> Start Month/Year for Phase 3: Jun '19 Project Location: San Joaquin Valley <br /> Phase 3 Duration: 12 months On-Road Motor Vehicle Emissions Based on EMFAC2002 version 2.2 <br /> Start Month/Year for SubPhase Building: Jun '19 <br /> SubPhase Building Duration: 12 months SUMMARY REPORT <br /> Off-Road Equipment (Tons/Year) <br /> No. Type Horsepower Load Factor Hours/Day <br /> 0 Other Equipment 190 0.620 8.0 AREA SOURCE EMISSION ESTIMATES <br /> Start Month/Year for SubPhase Architectural Coatings: Apr '20 ROG NOx CO SO2 PM10 <br /> SubPhase Architectural Coatings Duration: 1.2 months TOTALS (tpy, unmitigated) 0.05 0.15 0.12 0.00 0.00 <br /> Start Month/Year for SubPhase Asphalt: May '20 <br /> SubPhase Asphalt Duration: 0.6 months <br /> Acres to be Paved: 0 OPERATIONAL (VEHICLE) EMISSION ESTIMATES <br /> Off-Road Equipment ROG NOx CO S02 P 1 <br /> No. Type Horsepower Load Factor Hours/Day TOTALS (tpy, unmitigated) 0.09 0.02 0.23 0.00 0.07 <br /> 0 Pavers 132 0590 80 <br /> 0 Rollers 119 0..930 8..0 SUM OF AREA AND OPERATIONAL EMISSION ESTIMATES <br /> ROG NO CO S02 P 1 <br /> TOTALS (tpy, unmitigated) 0.09 0.17 0.35 0.00 0.07 <br />