My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 3:43:10 PM
Creation date
7/27/2020 2:14:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix C (continued ) <br /> 71 SO Overfill Valve in Tank Complete Shut Off Level Worksheet <br /> Important: This is meant to be supplemental worksheet and not a substitute to following the installation <br /> manual instructions. All length measurements are in inches. Please contact the Authority Having Jurisdic- <br /> tion (AHJ) and review local, state, and national codes to determine the regulatory requirements governing <br /> shut-off capacity in your region, as well as take into account other considerations such as extreme tank tilt. <br /> 'fake the following measurements with the valve , n- <br /> stalled in the tank: <br /> Distance from the 7150 inlet tube flange to the cast — - <br /> lug in the 71 SO body (see figures), upper tube length . <br /> Note : the Upper Tube Length must be at least 16" to in- <br /> clude the protective bend in the tube . <br /> ( D) = <br /> Distance from the 71 SO inlet tube flange to the top and <br /> bottom o lower tube, valve length . <br /> (W) _ (D) <br /> (U ) = Upper <br /> Tube <br /> Distance from the 71 SO inlet tube flange to the bottom <br /> of the tank. Note: If a tank bottom protector is present it - - - — - - <br /> may be necessary to add this thickness to dimension <br /> (OPW 6111 & 61TP models add 0.6") <br /> ( B) _ fir 1 (W} Valve <br /> Length, <br /> bottom <br /> From the tank calibration chart provided by tank manu- of cut <br /> facturer find the dipstick number (Y) which corresponds <br /> to the 100% vol ume. (g} <br /> (Y) _ To Tank <br /> 1 . To determine complete shut-off percentage : (Y) <br /> Subtract upper tube length (D) from distance to tank Tank <br /> pp g (U) Valve Chart <br /> bottom (B) J Length, 100% <br /> (X) _ (g) .. (p} + 1 .S" _ � 5 top of Volume <br /> Dipstick <br /> Using the tank calibration chart provided by the tank <br /> j manufacturer determine the tank capacity at the cal- <br /> culated (X) dimension and the 100% volume (Y) tank <br /> capacity. <br /> (X) tank capacity in gallons = I <br /> (Y) tank capacity in gallons = i J t0 V�7 - <br /> Complete S0% _ (X) capacity 1 (Y) capacity x100 = <br /> Note: The overfill valve must be installed per AHJ re- <br /> quirements and all applicable local, state, and national <br /> codes . If the overfill valve is set above the allowable <br /> shut-off percentage the overfill valve must be removed <br /> and replaced . <br /> Note : This Appendix only applies to valves installed per Appendix C. See Appendix B for the standard valve <br /> installation tank shut off level worksheet. <br /> 24 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.