Laserfiche WebLink
_3 2019 <br /> UNDERGROUND STORAGE TANK <br /> OVERFILL PREVENTION EQUIPMENT INSPECTION REPORT FORM(Page t if 1) <br /> up <br /> Type of Action LOInstallation Inspection ❑Repair Inspection Q 36 Month Inspection <br /> I. FACILITY INFORMATION <br /> CERS ID Date of Overfill Prevention Equipment Inspection <br /> l—3-19 <br /> stress Name(Same as Facility Name or DBA-Do(ng Business As) <br /> Business Site Address City _ ZIP Code <br /> II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Inspectlon(Print as shown on the ICC Certification.) Phone# <br /> :z 6 k2Nt% i IM;;-4N-W1 2S <br /> Contractor I Tank Tester License# ICC Certification# ICC Certi i alion ENpiratibn Date <br /> .` <br /> OvenNI Prevention Equipment Inspection Training and Ce ' catons(Li applicable cerfifrcations.) <br /> III. OVERFILL PREVENTION EQUIPMENT INSPECTION INFORMATION <br /> Inspection MethodManufacturer Guidelines(Specify): <br /> Used: <br /> ❑Industry Code or Engineering Standard(Specify): <br /> ❑Engineered Method(Specify): <br /> Attach the Inspection procedures and all documentation required to determine the results. #of Anached Pages <br /> TANK ID:(By tank number, stored product,etc.) <br /> What is the tank inside diameter?(Inches) <br /> Is the fill piping secondarily contained? ( Yes ❑No 19 Yes ❑No II Yes ❑No ❑Yes 0 No <br /> Is the vent piping secondarily contained? %Yes ❑No fA Yes ❑No f%Yes ❑No ❑Yes ❑No <br /> Overfitl Prevention Equipment Manufacturer(s) <br /> What is the overfill prevention equipment response EA Shuts Off Flow f.0 Shuts Off Flow Shuts Off Flow ❑Shuts Off riow <br /> when activated? <br /> (Check all that apply.) ❑Restricts Flow ❑Restricts Flow ❑Restricts Flow ❑Restricts Flow <br /> ❑AN Alarm ❑AN Alarm ❑AN Alarm ❑AN Alarm <br /> Are flow restnctors installed on vent piping? ❑Yes g No ❑Yes &yNo ❑Yes IZ No ❑Yes ❑No <br /> At what level In the tank Is the overfli prevention set <br /> to activate?(inches from bottom of tank.) Zrj V; to "LG <br /> What is the percent capacity of the lank at which the Q <br /> overfill prevention equipment activates? *4 4 063 <br /> Is the overilN prevention in proper operating conditionpl Yes X Yes QLYes ❑Yes <br /> to respond when the substance reaches the 91 <br /> appropriate level? 1 ❑No(Specify in V.) ❑No[Specify In V.) ❑No(Specify in V) ❑No(Spacify in V.) <br /> IV. SUMMARY OF INSPECTION RESULTS <br /> overfill Prevention inspection Results 10 Pass ❑Fail Pass ❑Fail 1 10 Pass [j Fail ❑Pass ❑Fall <br /> V. COMMENTS <br /> Any items marked"Fail"must be explained in this section. Any additional comments may also be provided here. <br /> VI. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS INSPECTION <br /> I hereby certify that the overfill prevention equipment was inspected in accordance with California Code of Regulations,Title 23, <br /> Division 3,Chapter 16,Section 2637.2 and all the Information contained herein is accurate. <br /> UST SerlimlechnIcian S' nature <br /> f <br /> y the facility has more components than this form accommodates,addlfionai copies of this page may be attached. <br /> CERS-Casomia Environmental Reporting System,10=lderdi o4on,UST-Urdemmund Skrage Tank,ICC=i0tematiord Coda Couri Ant-Audbe and Visual <br />