Laserfiche WebLink
FEB 0 2019 <br /> UNDERGROUND STORAGE TANK <br /> OVERFILL PREVENTION EQUIPMENT INSPECTION REPORT FORM (Page t of 1 ) <br /> FTypeof Action Installation Inspection ❑ Repair inspection ❑ 36 Month inspection <br /> I. FACILITY INFORMATION <br /> CERS ID Date of Overfill Prevention Equipment Inspection <br /> Ekisiness Name (Same as Facility Name or DBA-Doing Business As) <br /> Business She Address City 1 - 21P Code <br /> 11. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the inspection (Print as shown on the iCC Certification.) Phone # <br /> Contractor l Tank Tester License # ICC Certification # ICC Certi tion iration Date <br /> . ' <br /> Overfill Prevention Equipment Inspection Training and; ',��ons (Lis applicable certiRcations.) <br /> III. OVERFILL PREVENTION EQUIPMENT INSPECTION INFORMATION <br /> inspection Methocl Manufacturer Guidelines (Specify) : <br /> Used: <br /> ❑ Industry Code or Engineering Standard (Specify): <br /> ❑ Engineered Method (Specify): <br /> Attach the Inspection procedures and all documentation required to determine the results. # of Attached Pages <br /> TANK ID: (By tank number, stored product, etc.) <br /> What is the tank inside diameter? (Inches) <br /> Is the fill piping secondarily contained? [ Yes ❑ No Yes ❑ No IX Yes ❑ No ❑ Yes ❑ No <br /> Is the vent piping secondarily contained? Yes ❑ No to Yes ❑ No ( Yes ❑ No ❑ Yes ❑ No <br /> Overfill Prevention Equipment Manufacturer(s) <br /> What is the overfill prevention equipment response Shuts Off Flow Shuts Off Flow [A Shuts Off Flow ❑ Shuts Off Flow <br /> when activated? <br /> (Check all that apply) ❑ Restricts Flow ❑ Restricts Flow ❑ Restricts Flow ❑ Restricts Flow <br /> ❑ A/V Alarm ❑ AA/ Alarm ❑ AIV Alarm ❑ A/V Alarm <br /> Are flow restrictors installed on vent piping? ❑ Yes $0 No ❑ Yes &'No ❑ Yes Qi No ❑ Yes ❑ No <br /> At what level in the tank Is the overfill prevention set <br /> to activate? (Inches from bottom ortank.) <br /> What is the percent capacity of the tank at which the <br /> overfill prevention equipment activates? ® 3 ® Olt <br /> Is the overfill prevention in proper operating condition Yes ayes (�tj Yes ❑ Y =ffify <br /> to respond when the substance reaches the <br /> appropriate level? E1No (Specify In V.) ❑ No (Specify in V.) ❑ No (Specify In V.) ❑ N <br /> IV. SUMMARY OF INSPECTION RESULTS <br /> Overfill Prevention Inspection Results 10 Pass ❑ Fail Pass ❑ Fail Pass ❑ Fail ❑ Pass ❑ Fail <br /> V. COMMENTS <br /> ' Any items marked `Fail" must be explained in this section. Any additional comments may also be provided here. <br /> VI. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THiS INSPECTION <br /> 1 hereby certify that the overfill prevention equipment was inspected In accordance with California Code of Regulations , Title 23, <br /> Division 3, Chapter 16, Section 2637.2 and all the information contained herein is accurate. <br /> UST SerlirA.Techniclan Signature 3, <br /> Ki <br /> If the facility has more components than this form accommodates, additional copies of this page may be attached. <br /> CERS = Ca6fomia Ervirvnmental Repor" System, ID = identification, UST = Underground Storage Tank, ICG = International Code Coundi, AN = Audble and Visual <br />