Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page a of s) <br /> Vlll , MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed If a monitoring panel Is used to perform leak detection monitoring. Y N NA <br /> Are the visual and audible alarms operational? O ❑ ❑ <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, Q El <br /> tested , and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with o ❑ ❑ <br /> their proper operation? <br /> Was monitoring system set-up reviewed to ensure proper settings? Q Q ❑ <br /> Was the monitoring panel's backup battery visually inspected , functionally tested , and confirmed operational? Q ❑ ❑ <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under4spenser containment? z ❑ <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system falls to operate or is electrically ❑ ❑ <br /> disconnected? <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? <br /> Which sensors initiate positive shut down? (Check all that apply.) ❑X Sump Q Under-Dispenser Containment ❑ <br /> If alarms are relayed to a remote monitoring station, is all communications equipment (e,g „ modem) operational? ❑X ❑ ❑ <br /> For any answer of "N " above, describe in Section IX how and when these defrciencles were or will be corrected. <br /> IX. COMMENTS <br /> X. IN-TANK GAUGING TESTING <br /> ❑ Check this box if tank gauging is used only for inventory control, (Do not complete this section ) <br /> ❑ Check this box if NO tank gauging equipment is installed. (Do not complete this section.) Y N NA <br /> This section must be completed if inwtank gauging is used to perform leak detection monitoring. <br /> j Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination , including testing for n ❑ ❑ <br /> round faults? tom! <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely , functionally X ❑ ❑ <br /> tested, and confirmed operational? <br /> Was accuracy of system's product level readings tested? ❑X ❑ 1 ❑ <br /> Was accuracy of system's water level readings tested? X❑ ❑ ❑ <br /> Were all probes reinstalled property? ❑X 1 ❑ ❑ <br /> d Were all items on the equipment manufacturers maintenance checklist completed? FIE 1 ❑ 1 ❑ <br /> For any answer of "N" above, describe In Section XI how and when these deficiencies were or will be corrected. <br /> XI . COMMENTS <br /> Y = Yes, N = No. NA = Not Applicable <br /> r <br /> i' <br />