My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
440
>
2300 - Underground Storage Tank Program
>
PR0231055
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2023 3:10:24 PM
Creation date
7/27/2020 2:53:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231055
PE
2361
FACILITY_ID
FA0002321
FACILITY_NAME
Delta arco
STREET_NUMBER
440
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM ( Page 6 of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection), 3) devices monitoring tank <br /> annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment,• 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> Site Address- DELTA ARCO 440 W. CHARTER WAY STOCKTON CA 95210 <br /> Charter Way <br /> . I . t . T 2 8. . 5. _ .. . . . . _ . 10 9 . •. - - <br /> STORE <br /> ' 3. 4=, -. - _ . a 7. . . . . . . _. _ 12 . S . it <br /> n <br /> n QI M • <br /> It 87 <br /> KEY O <br /> A = APL MAR . . . _ . . . . . . . . . . . . . . . . <br /> F = FILLS 91 <br /> T = TURBLYE *PIPL\G 3 <br /> P = PROBE Drawing of piping <br /> V = VAPOR / t' _ . . _ . . . exit of sump and <br /> X = SLl�IPMNSOR � —/ . . . . . _ UDC's. NO <br /> L = LeakDetector F I underground <br /> Df = r%fsnrrat ; dtanmag is <br /> B = Brine Sensor - - _ i - - - - gglygatq xve <br /> I = Stuart Sensor cannot speculate <br /> S = STP blue prints-. <br /> C = Floats & ChAins CAR WAS <br /> E = E Stop <br /> _3rtt• items f1"*rV-oro01har are not risible to the eerti[tingtxlariciarr n4e a <br /> p-4fessieenl opiraareor3� mrlo-e sede�i fa- irr{ernrmorrrlptn�xs�. Drmring <br /> rxrt to scde <br /> Instructions <br /> If you alreadrj have a diagram that shows all required information , you may include it, rather than this page, with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify rotations of the following equipment, if installed: monitoring system control panels: sensors monitoring tank <br /> annular spaces, sumps , dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in-tank liquid level <br /> probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br /> LEGEND <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.