My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006833
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
420
>
2900 - Site Mitigation Program
>
PR0537485
>
ARCHIVED REPORTS_XR0006833
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2020 5:35:40 PM
Creation date
7/27/2020 3:33:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006833
RECORD_ID
PR0537485
PE
2957
FACILITY_ID
FA0021568
FACILITY_NAME
FORMER RAINWATER CAR WASH
STREET_NUMBER
420
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
21931206
CURRENT_STATUS
01
SITE_LOCATION
420 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br /> RAINWATER CAR WASH <br /> • Ground Water Aquifer Pumping Test Calculations <br /> Assumptions <br /> III • Pump Test No 1 extraction from EW-2 at constant ground water pumping rate of 6 0 GPM <br /> • Well EW-1 is screened entirely through First Water Zone <br /> 1 • Homogenous groundwater aquifer characteristics at wells EW-1, MW-1,MW-2 and MW-6 <br /> • The Jacobs Straight Line Method (Distance-Drawdown Method) can be utilized to <br /> 1 calculate hydraulic conductivity, transmissivity(T) and storatzvity yield utilizing draw-down <br /> versus distance on semi-loganthmic paper for each well location <br /> K hydraulic conductivity <br /> T =transmissivrty <br /> ' S =storativity <br /> Q = constant ground water pumping rate= 6.0. GPM. <br /> As = draw-down per 1-loganthzmc cycle (Appendix H) = 0.44 ft. <br /> 1 t� time of pump test (Appendix G) = 420 minutes <br /> ro — intercept of best fit line with the distance axis (Appendix H) = 140 feet <br /> . b =aquifer thickness <br /> 1 <br /> 6.0 GPM Constant Rate Pumping Test Calculations: <br /> T — 70Q--As -4 70(6 0 GPM) -- 0 44 ft = 955 ftz/day, or <br /> 1 T = 955 ft2/day x 1 gpd/ft - 0 134 ft'/day 7,127 gpd/ft <br /> ' S = T(t) - 640 (ro)Z -+ (955 ft'/day)(420 min) - (640)(140)2 = 0.032 <br /> K= T b -4 955 fl/day - 25 ft = 38.2 ft/day, or <br /> K= 38 2 ft/day l cm/s 2,835 ft/day = 0 0135 cm/s <br /> i <br /> 1 <br /> 1 <br /> Advanced GeoEAV[ronmental lo,, <br /> 1 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.