Laserfiche WebLink
06/25/2001 14 46 2094671 AGE 5TOCKTON PAGE 02 <br /> 22 June 2001 <br /> AGE-NC Project No 97-0333 <br /> Page 4 of 10 <br /> Zone, 7-hard Water Zone and Primary Aquifer Zone from P-7,P-8,P-9 and P-10 Results of <br /> the December 2000 CPT investigation were reported in Cone Penetrometer Testing Site <br /> Investigation - Fourth Quarter 2000, dated 07 February 2001, prepared by ACME <br /> • <br /> 31 January 2001 -Ground water monitoring and sampling were performed at wells MW-1, <br /> -- MW-2,MW-3, MW-4 and MW-5 Ground Water levels were measured between 15 and 16 <br /> feet below the tops of the well casings, ground water flaw direction at the site was inferred <br /> to be flowing towards the north at an approximate gradient of 0 001 Laboratory analysis of <br /> ground water samples detected TPH-g at the site at concentrations as high as 120,000,uga, <br /> BTEX compounds were detected at concent>rabous as lugh as 23,000 Ag/l,MTBE.and TANTE <br /> were detected at concentrations as high as 950,000 ug/l Tetrachloroethene (PCE) was <br /> detected in a water sample collected from MW-4 at a concentration of 4,900 ,ugll, <br /> trichloroethene (TCE) from MW-5 at a concentration of 12 ,ugll, 1,2,3-tnehlorobenzene <br /> from MW-2 at a concentration of 51,000 pg/l and hexachlorobutadiene from MW-1 and <br /> MW-2 at concentrations as high as 30,000 ,ug/1 Results of the January 2001 investigation <br /> were reported in Quarterly Report-First Quarter 2001, dated 30 April 2001, prepared by <br /> AGE <br /> 30 March 2001 Ground water extraction well EW-1 and groundwater observation well <br /> 1\4W-6 were installed at the site for performance of aground water pumping test Soil borings <br /> EW-1 and vl-VV-6 were advanced vertically to depths of 45 feet below surface grade (bsg) <br /> Boring EW-1 was single-completed as a 6-inch diameter ground water extraction well and <br /> MW-6 single-completed as a 2-mch diameter ground water observation well with screen <br /> intervals between 20 and 45 feet bsg Soil and ground water samples wore not collected <br /> during this investigation Results of the March 2001 investigation were reported in. Ground <br /> Watef Aquifei Pumping Tes!Repart- Second Quarter 2001, dated 15 May 2001, prepared <br /> by AGE <br /> • 05 April 2001 - A ground water aquifer pumping testing was performed at the site to assess <br /> the general ground wateir aquifer characteristics and to assess aquifer response to ground <br /> water extraction utilizing wells EW-1, MW-1, UW-2, MWA and NfW-6 at a constant <br /> pumping rate of 6 gallons per minute, purged ground water was containerized on-site in a <br /> 6,500-gallon poly tank (Balser tank) From data collected during the pumping test, a <br /> transmissivity i slue was calculated at 955 ft-/day, a. storativity value calculated at 0 032, a <br /> hydraulic conductivity value of 0 013 cm/s and a radius of influence projected at 140 feet <br /> utilizing a smi-logarithmic plot of draN%-down versus distance Results of the March 2001 <br /> navest7gatiori were reported in G ound Water Aquifer Pumping Test Deport-Second Quay tel <br /> 2001, dated 15 May 2001, ptepai ed by AGE <br /> • <br />